TNAG-0532-FCO40-627-Conservation-of-wildlife-in-Hong-Kong-1976 — Page 89

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

FIG 7.

EDGE DETAILS TO PREVENT EROSION BY WILD FOWL

то

Concrete edging

таший

*

1-6"

minimum

3=0" to 4-0'

*

6" to 8" concrete

*

water level!

1~6" to 2′-0′′

with a rough surface which appears 'natural'

to 1:8′′

223

"1

2" to 23/4

gravel

water level

$2"+03"

timber piling

Bank retained by timber piling below water level. This will take less heavy wear than the concrete edging above.

After Beazley 1969

D.S.M.74

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.