TNAG-0508-FCO40-573-Construction-of-underground-railway-system-in-Hong-Kong-1974 — Page 42

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

Schedule.

CONFIDENTIAL # 機密

fourth column of Part I of the Schedule in respect of

that item, the right to claim compensation therefor

shall be barred.

(2) The period referred to in subsection (1) may,

Lands

upon application made to the Tribunal either before or

after the expiry of that period, be extended in

accordance with this section.

(3) Notice of an application under subsection (2)

shall be given to the Director by the applicant.

Lands

(4) The Tribunal may extend the period within which

a claim must be served upon the Director if it considers

that the delay in serving the claim was occasioned by

mistake of fact or mistake of any matter of law (other

than the relevant provision in the fourth column of Part

I of the Schedule) or by any other reasonable cause or

that the Crown is not materially prejudiced in the conduct

of its case or otherwise by the delay.

Lands

(5) An extension may be granted by the/Tribunal

under subsection (4), with or without conditions for such

period as it thinks fit but not in any case exceeding

6 years from the time when the right to compensation

first arose.

Compensation

dis-

proportionate

to the value of land. Schedule.

G.F. 323

21. (1) Where it appears to the Governor that

compensation for any loss or damage under item 6 of Part

I of the Schedule is or may be disproportionate to the

value of the building to which the compensation relates,

CONFIDENTIAL

機密

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.