TNAG-0508-FCO40-573-Construction-of-underground-railway-system-in-Hong-Kong-1974 — Page 21

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONFIDENTIAL # #

4 -

機密

Preparation and promulgation of plans and maps.

PART II

Resumption of land and creation of easements

3. (1) The Director of Public Works shall cause

plans and maps to be prepared in such detail and with

such markings and endorsements thereon as are, in his

opinion, sufficient to delineate the railway area, being

that area within which land may be resumed or easements

in, under or over land may be created pursuant to this Ordinance for the purposes of and incidental to the railway.

(2) A copy of every plan and map prepared for the purposes of subsection (1) and signed by the Director

shall be deposited in the Land Office and shall be

available for inspection by the public free of charge

at such offices of the Government, during the hours

when those offices are normally open to the public, as

the Director thinks fit.

G.F. 323

(3) Any plan or map prepared for the purposes of subsection (1) and any marking or endorsement on any such

plan or map may be amended and any plan or map may be replaced by a substitute plan or map but the Director shall as soon as possible likewise amend, or replace with the substitute, every copy referred to in subsection (2) and

certify the amendment or substitution in such manner as

the Director thinks sufficient.

(4) The Director shall within 21 days of the deposit

of a copy of a plan or map in the Land Office or of any

amendment to such copy or the deposit of a substitute plan

CONFIDENTIAL

機密

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.