TNAG-0480-FCO40-545-Strength-of-garrison-in-Hong-Kong-1974 — Page 55

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

SCIFIDENTIAL

ANARK

A.

1.75/

77

PROPOSED 50%G TONG GARRISON

HOE

SUMMARY OF BUDGETARY COSTS

77/1978/1979/ 1000/

73 79 20

81

NATI

FRIGATE

1.6

2.0

1.6 1.6

PATRCI. CIPT

1.0 0.7

1.0

0.9

SUFFORD Carms

4.3

1.4

1.5

1.5

1.6Frigte. refit required in 1977/8 1.0 Fluctuations reflect phasing of contract

maintenance

TOTAL

3.9

6.0

4.0

4.1

ART

TENDE ARN UNITS

0.9 8.0 8.0

8.0 8.0

EQUIPAINT

*

13.8 3.6

15.0 13.3

3.6

13.3 13.0

3.5

3.5 3.5

OTHER SUPPORT COUTS 2.2 0.1

29.8

25.7

37

TOTAL

AIR FORCTI

HELICOPTER SQUADRON] 0.7

0.7

0.7

0.7

0.7

SUZIVAT CONS

TOTAL

0.9 9.9 3.9 1.6

0.9

1.5 1.0

1.5

WORKS SERVICES

6.0 6.0 6.0

6.0

6.0 Capital works programme arbitrarily reduced

to £1 per year.

AIR TROOFING

2.4

2.4 2.5

2.5

2.2

GRAND TOTAL

NEW PATROL CRAFT

43.4 42.7 41.1 41.140.6

0.1 2.3 5.8 Capital cost based on present plans

1

B.

SUMMARY OF FOREIGN EXCHGE COSTS

1.2

LOCAL DRAWINGS OF

PAY PAY OF LOCALLY ENGAGED EMPLOYEES MARRIED CHAPTERS AND WIRINGS.

WORKS SERVICES

OTHER PAYNEMS AND RECEIPTS (NET)

TOTAL FORTIGI EXCTANGE COUTS

28.7 26.5 27.1 26.826.9

13.4 11.9 12.1

12.0 12.0 UK and GURKHA personnel only

5.1 4.9

4.8 4.8 4.8 Service and Civilian

1.2 1.3 1.3

1.3

6.0 6.0 6.0 3.0 2.6 2.9

6.0 6.0 2.7 2.8

CRILET

Comments