PROPOSED HONG KONG GARRISON

SUMMARY OF BUDGETARY COSTS

1976/1977/1978/1979/| 1980/

ANNEX A

REMARKS

SUPPORT Cons

TOTAL

3.9

6.0 4.0

1.6 Frigate. refit required in 1977/8 1.0 0.9 1.0 Fluctuations reflect phasing of contract 1.3 1.3 1.4 1.5 1.5

maintenance 4.0 4.1

ARMY

TEETH ARM UNITS

9.9

8.0

8.0

8.0

8.0

SUPPORT UNITS

13.8 13.0

13.3

13.3 13.3

13.3

13.0

EQUIPMENT

3.6

OTHER SUPPORT COSTS TOTAL

29.5

3.6 2.2 2.1

2.1 2.1 2.1 26.7 27.0

3.6

3.6 3.6

27.0 26.7

AIR FORCE

HELICOPTER SQUADRON 0.7 0.7 0.7

0.7 0.7

SUPPORT COSTS

TOTAL

0.9 0.9 0.9 1.6 1.6

1.6

0.9 0.9 1.6 1.0

WORKS SERVICES

6.0 6.0 6.0

6.0

6.0 Capital works programme arbitrarily reduced

to £4 per year.

AIR TROOPING

2.4

2.4 2.5

2.5

2.2

GRAND TOTAL

NEW PATROL CRAFT

43.4 42.7 41.1 41.140.6

0.1 2.3 5.8 Capital cost based on present plans

B.

SUMMARY OF FOREIGN EXCHANGE COSTS

LOCAL DRAWINGS OF

PAY

13.4 11.9

12.1

12.0

12.0 UK and GURKHA personnel only

PAY OF LOCALLY

5.1

4.9

4.8

4.8

4.8 Service and Civilian

1.3

FING AGED FMPLOYEES MARRIED QUARTERS AND HIRINGS. WORKS SERVICES

OTHER PAYMENTS AND RECEIPTIS (NET)

TOTAL FOREIGN EXCHANGE COSTS

1.2 1.2 1.3 1.3

6.0 6.0 6.0 6.0 6.0 3.0 2.6 2.9 2.7 2.8

28.7 26.6 27.1 26.8 26.9