A420
Ord. No. 66/74
MASS TRANSIT RAILWAY (LAND RESUMPTION AND RELATED PROVISIONS)
Losses for which compensation may be claimed
(b) The cost of
a removal referred to
in item 9(a).
(c) The cost of
reinstating
an object or structure
described
in item (a)
above or of
replacing
the same
with a similar
object or structure.
(d) The loss
sustained by the forfeiture under section 14(5) of an object or structure which was erected and maintained without the contraven- tion of any Ordinance and is not to be reinstated or replaced
with a similar object or structure at the ex- pense of the
Crown under item (c) above.
10. The loss
sustained on account of the withdrawal of any approval or consent by the Building
Authority under section 15.
Basis on which compensation is to be assessed
(b) The cost incur-
red in moving the object or structure and making good
that part of the
building from
which it is removed.
Persons who may claim compensation
for their respective losses
(b) Any person who
incurs the cost.
(c) The cost incurred (c) Any person who
in so doing.
(d) The amount which might fairly and reason- ably be estimated as the loss of the claimant.
The amount which might fairly and reasonably be estimated as the loss of the claimant in respect of
(a) the reduction
of the open market value of land;
(b) materials, plant and equipment;
(c) professional
fees and
expenses actually paid or legally payable,
on account of the
withdrawal of
approval or consent.
incurs the cost.
(d) Any person
owning a share or interest in the object or struc- ture on the date on which it is removed under section 14(4).
The owner of the land affected by the withdrawal of approval or consent.
Period within which the claim must be served on the Director
(b) Same as in item
Xa).
(c) Before the expira- tion of 1 year from the date of rein- statement or re-
placement.
(d) Before the expira- tion of 1 year from the date of removal.
Before the expiration of 1 year from the date of withdrawal.
1
1
No comments yet.
Private notes are available after approval.