TNAG-0426-FCO40-472-Construction-of-an-underground-railway-system-in-Hong-Kong-1973 — Page 125

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

0003160 G.F. 316

SECRET

Government's Requirement

V.

Export Credits/Consortium Finance

Having regard to III(f) above:

(a) the amount should be a minimum of 60%

of the final contract price;

(b) Interest and charges should not exceed

6.5% p.a. all-in;

(c) the grace period should be at least

equal to the construction period for Stagos 1-4;

- 5-

Present Indications (as at 5th December 1973)

Japanese

56.3% of ceiling price

Yes

No

Anglo-Italian

H.K. Metro Constructors

Depends on contract price

Yes

No

Yes

Yes

Yes

(a) the repayment period should be at

least 12 years;

Yes

No

Yes

(e) the method of repayment should preferably

be on a Sinking Fund basis;

No

Negotiable

Negotiable

(f) capitalisation of interest:

(i) must be available over the full

grace period, and

Yes

Yes

Yes

(ii) should be at no higher interest

rate and no shorter repayment period than for the capital sum;

Yes

Yes

Yes

(g)

a Government guarantee must not be required.

Required

Not required

Not required

SECRET

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.