TNAG-0424-FCO40-470-Construction-of-an-underground-railway-system-in-Hong-Kong-1973 — Page 168

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

85

#S

Reference...

Enter the than 148.8

Zee

c/2

Mr Kerr

EEC RULES FOR SUB-CONTR CTING TC MEMBER COUNTRIES

1.

I attach a copy of the rules referred to by Mr Cottrell in paragraph C of his letter and the relevant portion of the rules is in Section II of the annex.

2. The position is that a sub-contractor is not a cosignatory to the contract. The principal contractor bears the sole responsibility to the buyer for the performance of the contract. within the Community a sub-contractor is automatically included in the cover which may be granted to the principal contractor and in a contract valued over 10 million units of account (roughly £4,200,000) it shall be up to 30% of the

value of the contract.

16 July 1973

Ката Tament.

C Tarrant

Financial Relations Dept

MR. BØRG (EID)

I attack the relevent Rates.

Thanks

MRM

1877

Mr. Moyland

сым ди

17/7/78.

This follows from your enquiry

1.

н

Mr. Hall

19/7

May wish to see

2. Eve Cabin/

below.

Стветст

1877

(17293) Dd.897465 400m 1/73 G.W.B.Ltd. Gp.863

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.