THE STEERING GROUP GAVE VERY CAREFUL CONSIDERATION TO

THE QUESTION WHETHER TO RECOMMEND A SINGLE-CONTRACT APPROACH

OR A MULTI-CONTRACT APPROACH, THE MULTI-CONTRACT APPROACH

HAS MANY ATTRACTIONS: IN PARTICULAR, THIS APPROACH IS LIKELY TO

GENERATE A GREATER AMOUNT OF COMPETITION WHICH, IN TURN, MIGHT LEAD

TO A LOWER OVERALL CONTRACT PRICE. ON THE OTHER

HAND, THE MASS TRANSIT RAILWAY IS THE FIRST PROJECT OF

ITS KIND IN HONG KONG, IN TERMS BOTH OF THE MAGNITUDE

OF THE CAPITAL REQUIRED AND OF THE LENGTH OF THE CONSTRUCTION

PERIOD. A DEGREE OF CERTAINTY OVER THE AMOUNT AND TERMS

OF EXPORT CREDIT FINANCE AVAILABLE, WHICH IS ONE OF THE MAIN ADVANTAGES OF THE SINGLE-CONTRACT APPROACH, COULD BE OF SOME IMPORTANCE AND, WITHIN LIMITS, COULD WELL OFFSET

THE DISADVANTAGE OF A HIGHER CONTRACT PRICE. A FINAL DECISION

ON WHICH OF THESE TWO APPROACHES TO ADOPT CANNOT NOW BE

MADE WITH CONFIDENCE BECAUSE THE INFORMATION AVAILABLE ON

THE PRICES AND CREDIT TERMS LIKELY TO BE AVAILABLE FROM

THE VARIOUS CONSORTIA WHICH HAVE PUT UP SINGLE-CONTRACT

PROPOSALS IS AS YET INSUFFICIENT TO ENABLE THIS TO BE DONE.

IN THE CIRCUMSTANCES, THE GOVERNMENT HAS DECIDED

THAT FURTHER CONSULTATIONS SHOULD BE HELD WITH SEVERAL OF

THE CONSORTIA WITH A VIEW TO OBTAINING, TO THE MAXIMUM EXTENT POSSIBLE AND WITHIN A STRICT TIME SCHEDULE,, THE

INFORMATION NECESSARY FOR A DECISION TO BE REACHED. I MUST EMPHASISE,

FOR THE AVOIDANCE OF DOUBT, THAT THE FACT THAT THE

GROUP IS TO HOLD FURTHER CONSULTATIONS WITH CERTAIN

CONSORTIA DOES NOT INDICATES A PREFERENCE FOR THE SINGLE-

CONTRACT APPROACH. IN OTHER WORDS, I MUST EMPHASISE THAT A

DECISION ON THE APPROACH TO BE ADOPTED HAS YET TO BE MADE.

BUT, WHATEVER ARRANGEMENTS ARE MADE TO FINANCE, CONSTRUCT AND EQUIP THE MASS TRANSIT RAILWAY, THERE WILL HAVE TO BE

A BODY TO BE RESPONSIBLE FOR IMPLEMENTING THE PROJECT THOUGH

THE EXTENT TO WHICH THE RESPONSIBLE BRODY WOULD HAVE TO

BUILD UP ITS OWN ENGINEERING DESIGN AND PROJECT MANAGEMENT

CAPABILITY FOR THESE TASKS WOULD DEPEND ON WHETHER

A SINGLE OR MULTI-CONTRACT APPROACH WAS ADOPTED. AN ENTITY

WILL ALSO BE REQUIRED TO OPERATE AND MAINTAIN THE SYSTEM AFTER

CONSTRUCTION. IN THIS RESPECT, THE SIZE AND NATURE OF THE PROJECT

-3-