10.
The recurrent cost of running a library of this size, in its complete form, will be about $1.5 mn p.a. based on a staff of Librarian, 16 other p-ofessional level staff, and up to 60 other library assistants and minor staff, including bindery staff. This will have to be met from Hong Kong funds.
11.
The total cost of the proposed library can, therefore, be summarised as follows:
Sq.
ft.
1600 reading places at 25 sq.ft.
net per place
40,000
Balance allocation at 40% of
net figure
16,000
56,000
300,000 volumes @ 60 sq.ft.
per 1,000
18,000
Total
74,000
74,000 sq.ft. @ HK$80 per sq.ft.
5,920.000
Professional fees @ 9% of
construction costs
531,000
Furniture & equipment @ 30%
of construction cost
1,770,000
Acquisition of 100,000 volumes
@ $50 per volume
5,000,000
Acquisition of technical journals
at rate of $100,000 per annum for 3 years
300,000
Total
13,521,000
12.
A contribution from H.M.G. could be spread over the financial years 1973/74 to 1975/76 in concert with the development of the project and the following timetable is suggested: