113800€
ORIGINAL COASTLINE
11020QE
78600N
2-1
0.7
0.7
0.3
5.0
1.6
1-4
1-8
0.7
1-4
1-1
0.7
4-3
1.3
REFUSE
DUMP
0.5
0.2
1.6
یا
10
2-1
REFUSE DUMP RUBBLE MOUND
SCALE IN FEET
400
600
800
1000
100500
200
ENGINEERING REPORT
CONTAINER TERMINAL
KWAI CHUNG
1-6
1.6
0.8
0.0
2.4
8.5
1-5
1-6
2-3
11.0
0.0
2-0
2-4
1-8
1.0
1-5
1-5
ORIGINAL
COASTLINE
CULVERT
BREAKWATER
3.3
2.0 3.7
LIMIT OF BREAKWATER FOUNDATION
5.6
6.2
2.0
2.3
0-0
3.0
1.0
4-0
2.5
3-5
2-0
2.0
3.8
4.0
1.0 5.4
10
2.5
6.4
5.7
6.3
3.6
0.5
1-5
11-0
12-0
5-5
7.6 25
1.0 5-2
6.3
3.0
14.4
6.0
11-5
9.51.5
5-0
PILLAR ISLAND
(TSING CHAU)
120 6.4
SILTING
PLAN
MONG
CHAU
73400N
NOTES:-
1.
FIGURES SHOW REDUCTIONS IN DEPTH IN FEET.,
2. (1) REDUCTION IN DEPTH OF THE SEA BED BETWEEN JULY 1954
AND OCTOBER 1966 15 SHOWN IN BLACK.
3.
4.
5.
(ii) REDUCTION IN DEPTH OF THE SEA BED BETWEEN JULY 1954
AND NOVEMBER 1968 IS SHOWN IN RED.
THE JULY 1954 SOUNDINGS ARE THE LATEST AVAILABLE BEFORE
THE REFUSE DUMP RUBBLE MOUND WAS CONSTRUCTED.
REFUSE DUMP RUBBLE MOUND CONSTRUCTED JANUARY TO
DECEMBER 1955. REFUSE DUMP OPENED ON COMPLETION.
RUBBLE MOUND FOR EXISTING BREAKWATER CONSTRUCTED
SEPTEMBER 1964 TO SEPTEMBER 1966.
-73400 N
113800E
110200 E
PORT WORKS DIVISION
P. W. D. HONG KONG
13