TNAG-0273-FCO40-309-Scheme-for-development-of-container-terminal-at-Hong-Kong-1970 — Page 6

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

Chapter

12. ESTIMATED COSTS

Page

12.1

Basis

12.2

Summary.

12.3 Details

13. CONSTRUCTION PROGRAMME

52

52

53

13.1

13.9

Stage 1 Stage 2

·

13.14 Stage 3

.

14. EFFECT ON ROAD SYSTEM

14.1

Likely Traffic Generated.

14.6

14.7

Capacity of Road System

Containers on Roads

15. GENERAL RECOMMENDATIONS

Quaywall

Reclamation

15.1

Berths

15.2

15.3

15.4 Layout

15.5

Stages of Construction

15.6

Method of Operation

15.7

Tendering

15.8

Special Conditions.

TABLES

Table

1. Summary of Costs & Times for Completion

2. Land Areas & Filling Quantities

3. Quay-Structure Loadings

4. Dredging Quantities (cu. yds.)

5. Reclamation Quantities

6. Development Schemes

7.

Fill Sources & Distribution

8. Details of Costs ($ Million)

9. Forecast of Generated Traffic

10. Maximum Vehicle Dimensions

FIGURES

Figure

1. Settlement & Cost / Replacement Depth 2. Settlement & Cost / Sand-Drain Spacing

3. Consolidation of Clay / Time

4. Surcharge / Sand-Drain Spacing

V

54

$5555

555

56

57

57

****8 8 8 8

59

59

59

59

60

60

60

60

1

2

29

35

45

47

51

52

56

57

40

41

43

44

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.