TNAG-0272-FCO40-308-Scheme-for-development-of-container-terminal-at-Hong-Kong-1970 — Page 87

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

'GIN || DRINKERS "BAY

TSINIG

SCREENING

PLANT (UNDER

CHAU

CONSTRUCTION)

FUTURG

TSINGT

801066

YI ISLAND

-30%

-40'

FUTURE

RECLAMATIO

11

BERTHS (TEMPORARY)

0214917

-So

-FLYOVER SUBJECT TO

DETAILED DESIGU

- FOR KONG STATION

KWAL

-EXISTING CULVERT

PROPOSED OVERHEAD

RAILWAY-

снима

ROAD

DRAINAGE FUTURE

RESERVE

AND

RECLAMATI ONË”.

EXISTING

BREAKWATER

MONG

CHAU

32 ACRES

43 ACRES

25 ACRES

25 ACRES

ACRES

LIGHTER

BERTHS

BERTH No. 1

1,000 FT.

BERTH No. 2 1000FT

BERTH NO. 3

BERTH No. 4

1000 FT

1000 FT

250F7

NOTE:

PROPOSED

-50

TO BE DREDGED TO ~40' ̊C.D.

AT KWAI CHUNG

CONTAINER TERMINAL AT

500 SCALE IN FEET 1500

2,000

{

73IMG YI

~ ISLAND

TSUEN WAN

JDRINKERS

COMBLER CHANNEL

GREEN

ISLAND

CHELNG

PROPOSED SITE 3 HA WAN

STONE CUTTERS

13.AND

HONG KONG

IS LOND

AHLE !

/

SCALE IN MILES

3

ALL ACREAGES ARE APPROXIMATE.

PORT WORKS DIVISION P.W.O. No. 2428/68

P. W. D.

H. K.

DRAWING NO.

P. 4414

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.