5.

I SHOULD APPRECIATE SOME GUIDANCE AS TO YOUR PREMENT

THINKING, IF POSSIBLE BY SATURDAY MORNING HONG KONG TINE.

MY OWN RECOMMENDATION REMAINS AS IN PARA 2 OF NY LETTER

OF 27. FEBRUARY 1BYT TO GOWERS VIZ. THAT IT IS NOT FOR US

TO PERSUADE HONG KONG THAT THE TUNNEL MUST BE BUILT, OUT

THAT IT IS VERY MUCH OUR INTEREST TO SEE THAT ANY TUNNEL WHICH

EVENTUALLY CONSTRUCTED IS THE WORK OF A BRITISH CONTRACTOR.

I NEED HARDLY POINT OUT THAT ANY CONTRACTOR WHO GETS THIS PRESENT

TUNNEL CONTRACT WILL BE FAVOURABLY PLACED TO BID FOR THE MUCH

LARGER MASS TRANSIT SYSTEM CONTRACT WHICH LOOKS INCREASINGLY LIKELY

TO BE CALLED IN THE NEXT EIGHTEEN MONTHS AND FOR THE AIRPORT

RUNWAY EXTENSION.

%.

AS A POSTSCRIPT HAY I ASK YOU TO BRIEF PETER TENNANT OF BREC

BEFORE HE LEAVES LONDON. HE WILL DINE WITH KE ON FEBRUARY 10 AND

CLAQUE AND KADOOR IE ARE TWO OF THE GUESTS AND ARE PRETTY CERTAIN

TO FACE HIM WITH ALL THIS.

FCO PLEASE PASS TO C.R.E.D., E.C.G.D. AND BOARD OF TRADE PRIORITY.

[Copies sent ECG)]

GON

Air D. Then

SENT AT

RECD AT 08362 3 JAN 69