Note
Appendix III
1) The Hong Kong cost content per square yard allocated to loomstate materials must correspond exactly to the cost indicated in column (d) of Appendix II or IIA for the construction of material concerned.
2) The Hong Kong cost content per square yard allocated to various
finishes must correspond exactly to the costs shown in Appendix I for the processes concerned. No processing costs other than those shown in Appendix I may be included in a costing. These listed costs include allowance for ancillary processes such as desizing, singeing, scouring, calendering, stentering and inspection. Only ONE of the sanforizing, schreiner, or pre-shrinking finishing costs can be claimed in respect of the same fabric.
3) If any applicant wishes to claim a high Hong Kong cost content per
square yard for a special type of weave that is not shown in Appendix II or IIA (such as special dobby weaves) prior written approval for this must be sought from the Department before the costing is prepared. Similarly, if applicants wish to claim higher costs per square yard for special finishing processes, prior written approval should be obtained from the Department before such costs are included in the costings.
No comments yet.
Private notes are available after approval.