September_1967 — Page 10

Far East Builder 遠東建築雜誌 All

34

DARWROOM

Iss

·

Cost

Site formation

HK$

95,000

Building works

4,365,000

Air-conditioning

1,064,000

5,524,000

PLASTERK MOLLE

DALÁNDE

I HUHITE

T:

E

RESTRE-V

HOLL

GROUND FLOOR PLAN

Total

The professorial block is connected by means of a covered bridge on the third floor level to the first floor of the hospital wards, so that patients can be trollied to the professors or specialists for consultation without leaving the building.

An additional new bed-passenger lift at the end of the bridge, attached to the existing hospital building, was also constructed to provide vertical transportation from each floor to the bridge.

Building Time

The professorial block was started in July 1965 and completed in April 1967, a construction period of 22 months.

Sub-contractors & Specialists

LIFT MALL.

3 rd. FLOOR PLAN

J. Raz

AK CABINE *

SECTION BB

RESEARCH LABORATORY

HOUSE

תך

I

LABORATORY

Air-conditioning

Engineering Ltd.

-

Electrical installation

General Electric Co. Ltd.

Elevator installation Engineering Corp. Ltd.

Steam installation

Service (thro' E. & M.

Vinyl tile flooring

Trading Co. Ltd.

Mosaic tile flooring

Hong

International

-

British

Jardine

Engineering

Office)

The Swedish

Che Cheung

Asphalt roofing and tanking

Sino-British (HK) Ltd.

Suppliers

Metal windows and doors Steel Works Ltd.

China

Wai

Standard under-bench units Sun Furniture and Decoration.

Front elevation of professorial block

THE

Far East Architect & Builder September, 1967