1 circuit for sub-station auxiliaries. 3 local circuits.
1 bus coupler.
Mahang Reservoir
Water discharged from the three turbines will be led through a 16 ft. diameter 5,000 ft. long tailrace tunnel (designed to run full) and will be im- pounded in a regulating basin (Ma- hang Reservoir of 350 acre-ft. capa- city) formed by the construction of the Mahang dam. This dam, again of rolled earth fill construction, will be 50 ft. high and will contain 150,- 000 cu. yd. of earth fill,
Water will then be led through three reinforced concrete culverts em- bedded in the Mahang dam to the Odak power station and finally dis- charged into the Batang Padang River. Provision will be made for a rein- forced concrete bellmouth spillway which can discharge a maximum flow of 1,200 cusecs.
Odak Power Station
This will be a surface power station, housing three 1,400 kW Francis water- wheel driven alternators feeding into the 11 KV bus at Woh switchyard.
Access Roads
A total of 18 miles of 8 ft. wide tarmacadam access roads leading to the various sidestream intakes, tunnel adits, etc., will have to be constructed.
Location of these roads on steep side- long jungle-covered slopes has not been an easy task.
Consultants
The consulting engineers to the National Electricity Board are Preece, Cardew & Rider, London, in associa- tion with Binnie & Partners, London. The Board's Project Engineer is Mr. P.G.D. Shallow, MA. MICE, MIWE.
Contractors
Contract No. 1 B Switchgear
Allmanna Svenska Electriska Aktiebolaget-Sweden (A.S.E.A.) Contract No. 2 Transformers
Savigliano, Italy. Contract No. 6 Civil engineering works
Hochtief-Holzmann, Germany. Contract No. 8 Control gates
Glenfield & Kennedy, Scotland. Contract No. 9 Mechanical and electrical plant Woh power station
Fuji Electric Co., Japan. Contract No. 10 Mechanical and electrical plant Odak power station
Şalzgitter, Germany. Contract No. 11 Cables
not yet awarded.
Subcontractors
Under contract No. 6 Penstock pipes
—
Voost, Austria.
L
Penstock prepacked concrete
Intrusion Prepakt (Far East) Ltd., Hong Kong.
Site exploration, cut-off grouting
etc.
Cementation Ltd., London. Dams, Odak P.S.
Kien Huat Ltd., Kuala Lumpur. Engineers' housing and offices Boon & Cheah Ltd.,
Kuala Lumpur.
Access roads
Liew Ling, Ipoh.
Sidestream intakes
Chop Wah Lee Construction Co., Cameron Highlands.
Under contract No. 9
Erection of plant
Overseas Construction Co., Japan.
Supply of cranes
Nippon Crane Works, Japan. Supply of inlet pipes
Sakai Iron Works, Japan.
Acknowledgement
The author wishes to express his thanks to Y.M. Raja Zainal JMN, MIE (FM), General Manager, Na- tional Electricity Board, for permis- sion to write this article, and to the three resident engineers, Mr. D.E. Cox, BSc (Eng), AMICE, Mr. P.C. Sadler, BSc (Eng), MICE, and Mr. M.V. Seewer, for their help in its preparation.
Weir and stilling basin for the Odak power station tailrace basin spillway. Embanking for Mahang Dam in progress beyond;
three of the five culverts passing through the dam can be seen
Far East Architect & Builder September, 1966
63