BATANG
PADANG
HYDRO ELECTRIC SCHEME
jor
power station.
JOR RESERVOIR
(Cameron Highlands
Scheme)
JOR SADDLE
DAM
BOT ADIT
UPPER
SURGE SHAFT
SURGE SHAFT
ADIT
TAILRACE BASIN
ODAK
POWER STATION
Semai
LAMEL
Ransak
Tunnel
S Bot
Tidong
Woh Tunnel
SWoh
Ringlet Reservoir
(Cameron Highlands Scheme)
Bot
PAHANG
PERAK
padang
Bembar
4
MENGLANG
INTAKE
JOR MAIN DAM
LENGKOK
INTAKE
BOT INTAKE
CHENES INTAKE:
Busgk
†TIDONG INTAKE
HE
WOH INTAKE
WOH
POWER STATION
$ Batang
SWITCHYARDI
PUBLIC WATER SUPPLY INTAKE
Telom
SCALE:-
→To Kuala Lumpur 39 miles
Mile
t
2 Miles
row areas, the material being excavat- ed by means of three 2 cu. yd. face shovels and transported to the dams in sixteen 16 cu, yd, rear dump trucks along specially constructed haul roads.
The material is then spread by bull- dozers into 9 in. layers and consoli- dated to approximately 6 in. layers by rubber-tyred rollers on the clay cores and vibrating rollers on the shoulder and transition zones of the dams.
A fully equipped soils laboratory on the site keeps a continuous check on all fill materials. Drilling and cement grouting of the rock underlying the core of the dams is being carried out, which with a concrete cut-off wall in the dam foundations, will ensure an effective water barrier to possible seepages below the dams.
To control excessive floods in the Jor reservoir after impounding, a con- crete siphon bellmouth spillway, 150 ft. high and 125 ft. top diameter, cap- able of discharging up to 39,000 cusecs. of water through the spillway tunnel, is under construction. The flood water will then pass through a stilling basin to break up the force of the flood discharge before joining the Batang Padang River downstream of Jor dam.
A reservoir outlet controlled by two 72 in. valves will be set in the inlet structure of the diversion tunnel so as to lower the reservoir level if required.
An 8 ft. wide road will be con- structed from the Cameron Highlands Road to Menglang intake over the crests of both the Jor main and Jor saddle dams.
Jor main dam. Euclid tippers standing on the upstream shoulder with the partly built syphon bellmouth spillway beyond