November_1967 — Page 49

Far East Builder 遠東建築雜誌 All

Contracts awarded

HONG KONG GOVERNMENT

Maintenance and repair of roads and Chui Hing Construc- bridges in New Territories (East) for tion Co., Ltd. 2 years. At scheduled rates plus 122%

Maintenance of roads and bridges in Ching Hing Construc. Eastern Kowloon and New Kowloon for tion Co., Ltd.

12 months. At scheduled rates plus

142%

Maintenance and repairs of roads and Kwan On

bridges in New Territories (West) for a

period of 2 years. At scheduled rates

plus 16%

Maintenance of roads and bridges in Wo Hing Construction Western Kowloon and New Kowloon Co., Ltd.

for 12 months. At scheduled rates plus 9%

Construction of Tsuen Wan West Bus Maeda Construction Terminus. $568,116

Co., Ltd.

Maintenance and construction of Chi Fuk Construction drainage works in New Territories for Co.

a period of 2 years. At scheduled

rates plus 271⁄2%

Reconstruction of Heng Lam Street Hang Cheong Con- from Junction Road to Fung Mo Street. struction Co. $124,307

Reinstatement of trenches in Kowloon Wo Hing Construction and New Kowloon for 12 months. At Co., Ltd. scheduled rates minus 3%

Construction of roads, drains and sur- Barbican Construction faces for Ngau Tau Kok Resettlement Co.

and Low Cost Housing Estates, stage

IV. $512,498

Construction of Resettlement Housing Shun Hing Co. blocks 4, 5 and 6 and estate school

1 at Pak Tin (Area "B"). $3,382,274

Extension of service reservoir, Aber- Chui Hing Construc- deen Water Supply

$732,234

Stage 1.

tion Co., Ltd.

Construction of Castle Peak Road/Lei Kwan On Muk Road/Kwai Chung Road junction.

$563,963

Laying of 48 in. fresh water main from Chi Fuk Construction Lion Rock Reservoirs to Jordan Val- Co.

ley. $1,234,955

Construction of a women's prison at Shun Hing Co.

Tai Lam Chung. $2,251,275

Maintenance of waterworks-electrical Empire Engineering installations, 1967/68. At scheduled Co., Ltd. rates plus 9% for materials and 92% for labour

Reconstruction and widening of Pui Ching Road. $647,905

Widening of Pokfulam Road, stage IV

Part 1. $211,500

Chui Hing Construc-

tion Co., Ltd. Wing Loong Co.

Supply and installation of two goods/ Gilman & Co., Ltd. passenger lifts and two bed/passenger lifts at New Convalescent Block, Kow- loon Hospital. $498,000

Construction of superstructure

Government Offices

Construction of Additional Quarters for Technic Investment Aberdeen Fire Station, $57,958

& Construction Co. Construction of Post Office and Fire Kai Tai Construction Station at Rennie's Mill Village, New Co. Territories. $199,750

Construction of pipe water supply Universe Construction scheme at Tai Tseng, Ng Uk Tsuen, Co.

Ping Shan, Yuen Long. $10,962

Construction of a 5-seater aqua privy Paul Construction Co. at Tin Liu Tsuen, Shap Pat Heung, Yuen Long. $10,980

Improvement to drainage system at Lee Shun Construction San Hui, Tuen Mun, Yuen Long.

$12,791

Co.

Construction of a 5-seater aqua privy Fook Kwong Construc- at Sheung Tsuen Pat Heung, Yuen tion Co. Long. $12,975

Construction of stream embankments Yick On Kee Con- at Mang Kunk Uk, Hang Hau, N.T. struction & Decoration $28,750

Construction of a Temporary Market Fu Hing Construction at Hip Wo Street, Kwun Tong, Kow- Co., Ltd. loon. $107,300

Typhoon damage (construction of new Ping Kee Construction dormitory accommodation) at Shek Pik Co. Training Centre, Lantau Island.

$188,985

Site formation for latrines and bath- Chuen Hing Co. houses at Yuen Long (south of main road) and Tuen Mun San Hui, Yuen

Long, New Territories. $21,709

Electrical Re-wiring of all Mark and The British General Mark 11 Hung Hom Domestic Resettle- Electric Co., Ltd. ment Blocks. $157,500

Piling to foundations for Transformer Paul Lee Engineering House at Kennedy Town Abattoir, Co., Ltd. Hong Kong. 513,350

Supply of Metal Windows for Estate Canton Metal Window School attached to Blocks 4 and 5, Manufacturing Co., Ngau Tau Kok Low Cost Housing (Area Ltd.

"A"), Kowloon. $10,800

Supply of Metal Windows for Estate Canton Metal Window School attached to Blocks 1 and 3, Manufacturing Co., Ngau Tau Kok Low Cost Housing (Area Ltd.

"A"), Kowloon. $10,800

Supply and installation of an Aircon- The Jardine Engineer- ditioning Plant for Computer Centre, ing Corpn., Ltd. 6th & 7th Floors, West Wing, C.G.O.,

Hong Kong. $139,800

Supply of metal windows for Estate Canton Metal Window Schools Nos. 1 & 2 attached to Blocks Manufacturing Co., 1-6 incl. at Kwai Chung Low Cost Ltd.

Housing (Area 9), New Territories. $21,600

Supply of metal windows for exten- China Steel Works, sion to existing Middle

School

Cheung Chau Island. $13,850

at Ltd.

Supply of adjustable metal louvre win- Precast Products, Ltd. dow frames for a Women's Prison at

for Yick Lee & Co., Ltd.

at Murray Bar-

Tai Lam $14,893

racks, Hong Kong. $13,065,600

Construction of an estate welfare cen- The United Enterprise

tre at Ham Tin Resettlement Estate, Co.

Kowloon. $309,453

Construction of Portland Street Sewer Yee Lee & Co.

Tai Kok Tsui/ Yau Ma Tei Sewerage

District Development. $758,810

Decking of Hing Wah Street Nullah Yick Hing Construc-

from Po On Road to Fuk Wing Street tion Co.

and reconstruction of Hing Wah Street

from Po On Road to Un Chau Street.

$354,750

Construction of roads and drains for Chi Fuk Construction departmental quarters, Au Tau, stage Co.

1. $179,514

Site formation for resettlement hous- Henry Engineering & ing at Chai Wan, Area 7. $322,836 Construction Co., Ltd. Supply and installation of conveyors Jardine Engineering to Waterfront Road through Causeway Corporation Ltd. Bay Typhoon Shelter. $742,000

Electrical installation at Government The British Generat Offices. Murray Barracks, Hong Kong. Electric Co., Ltd. $1,164,000

Chung

New

Territories.

Electrical installation for extension to Shun Cheong Electric existing Middle School at Cheung & Metal Mfer.

Chau Island. $23,825

Supply and laying of mastic asphalt British Orient Ltd. roofing for a Women's Prison at Tai

Lam Chung, New Territories. $50,507

Supply of metal windows for estate Canton Metal Window school attached to Block 8 at Shek Lei Manufacturing Co., Resettlement Estate (Area B.) New Ltd.

Territories. $10,800

Supply and laying of mastic asphalt British Orient Ltd. roofing to Blocks 26 & 27 at Sau Mau

Ping Resettlement Estate, (Stage II),

Kowloon. $28,858

Supply and installation of a False G.K.N. International Floor for Computer Centre, 6th and (S.E. Asia) Ltd.

7th Floors, West Wing, C.G.O., Hong

Kong. $46,514

Supply of metal windows to estate Canton Metal Window

school attached to Blocks 1, 2 and 1 at Manufacturing Co., Shek Lei Resettlement Estate (Area Ltd.

"A"), (Stage 1), New Territories. $10.800

Far East Architect & Builder November, 1967

75

75

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.