16
Alcoa International – reception
two mirror reflector type fluorescent fittings for every modular bay. The level of illumination can be selected from 30 to 60, or 90 foot candles by using one, two or three tubes on each fitting.
A broadcasting system is installed throughout the building with conceal- ed speaker units fitted in the entrance lobby and in the corridors.
The total cost of the building, was approximately HK$40 million.
Ahong Construction Co. (HK) Ltd., was the main contractor. Piling and
foundation work was carried out by Franki Piling & Engineering Co. (HK) Ltd. The steel framework was supplied by Redpath Brown & Co. Ltd., UK, and erected by Steel Structures, Ltd.
Sub-contractors included:
Schindler lifts Jardine Engineer- ing Corp. Ltd.
Curtain walling - Alcoa Interna- tional (Asia) Ltd.
-
Inter-
Carrier air-conditioning national Engineering Co. Ltd.
Ventilated ceilings, telephones and lighting - Philips Hong Kong Ltd.
Electrical installation General Electric Co. Ltd.
Plumbing installation Engineering Co. Ltd.
-
British
-
General
Johns Mansville ceilings - American
Engineering Co. Ltd.
Ltd.
Marble works Duro Industries
―
Supply of sanitary fixtures and fittings Dodwell & Co. Ltd. and Denis Hazell & Co. Ltd.
Hardware
―
Davie Boag & Co.
Ltd., Shewan Tomes (Equipment) Ltd. and The China Engineers Ltd.
Spandrel glass and Armour-plate glass doors Shewan Tomes (Equip- ment) Ltd.
Ltd.
Ltd.
Bronze-tinted glass – Olivier & Co.
Steel windows Dodwell & Co.
T
Asphalt tanking and roofing William Jacks & Co. (HK) Ltd.
—
P.V.C. tiles SCA Building Pro- ducts, Holmsund, Sweden
―
Rolling shutters Suzuki Shutter Co. (HK) Ltd.
Marble for Bank of America Varrinini Const. Co. UK.
Window cleaning cradles Mills Scaffolding Co. Ltd., UK.
Ltd.
Sundry aluminium works - Petman
1
|
***
STEEL STRUCTURES
SS
STEEL ERECTION & WELDING SPECIALISTS
FOR THE
ST. GEORGE'S BUILDING
Far East BUILDER, July 1969
No comments yet.