for extension of the works to cope with the increased load are in hand.
Six digestion tanks are provided and they are constructed in reinforc- ed concrete with the roof ring beam in prestressed post-tensioned con- crete. The tanks are of 70 ft. dia- meter, each having a capacity of 885,000 gallons.
The sludge in the digestion tank is to be heated by the engine cooling water from the compressor house and each tank is to be installed with four Heatamix combined gas lift sludge heaters and circulators to keep the sludge in the digestion tanks to a tem- perature range of 110°F-120°F.
As the digestion tanks are of fix- ed roof type, gas is fed into a 661⁄2 ft. x 47 ft. high adjacent fixed gas- holder having a capacity of 120,000 cu. ft. at a pressure of 12 in. w.g. (g) Compressor house
There is no economic necessity for the generation of electricity at the works as the power required is main- ly for the diffused air plant. Direct driven compressors using dual fuel compressors are installed to deliver air either at 71⁄2 p.s.i. into a 24 in. air main feeding to the west works or at 6 p.s.i. into a 54 in. main delivering Provision is also to the east works.
made in the new compressor house to take two existing compressor sets from the west works compressor house which would be put out of use.
(h) Construction aspects
Site clearance and bulk excavation for all the main treatment units and pipelines were carried out under an earlier contract (site preparation). Un- der this contract a drainage system to take surface water from all sites was built and this greatly reduced problems of drainage of rainwater in subsequent contracts.
The ground was generally firm sandy clay and no foundation pro- blems existed.
In all the main contracts. phasing of construction of the various com- ponents of each contract was of prime importance to suit site requirements, supply of pipework and machinery, and progress of other contracts. The contractors' programme and organiza- tion were therefore subject to close study and surveillance by the Public Works Department.
Close supervision on control of concrete mixing was kept to ensure a consistently high quality concrete. The sequence of concreting and form and position of construction joints are subject to specified requirements and the resident engineer's approval. (i) Integration of east and west works
When the new works (east works) are completed and commissioned, both this and the existing works (west works) will be combined to form an integrated works with common pumping station for crude sludge and drainage, same source of air supply. and common outlet for final effluent and digested sludge.
Far East BUILDER, July 1968.
A.
CONTRACTORS
Description of Works
Contractor
Stage of Progress
PUMPING STATIONS,
RISING MAINS, GRAVITY SEWERS.
Pumping machinery (for Brad- Allen Gwynnes Pumps Completed dell Road & Bartley Road pump- Ltd. Agent: The Bor- ing stations)
Site preparation for Road pumping station Braddell Road pumping station
Amount in $$
498,000
neo Co. Ltd.
Supply of steel sheet piles (for The British Steel Pil- Completed Braddel Road pumping station, ing Co. Agent: Sime
159,000
Darby & Co. Ltd. Braddell N.C. Senan & Sons
Completed
474,000
Paul Y Construction Completed & Co. Ltd.
Commissioned
1,834,000
-do-
564,000
Completed
519,000
Completed &
541,000
Commissioned
· Swee Construction & Transport Co.
-do-
199,000
Lian Hup Han
-do-.
1,242,000
Swee Construction & Transport Co.
843,000
42,000
Bartley Road pumping station Sum Mun Kum Supply and delivery of steel Hume Industries (F.E.) pipes and specials (for rising Ltd. mains No. 1 & No. 2) Rising main No. 1
Rising main No. 2
Gravity sewer No. 1 Gravity sewer No. 2
Supply and delivery of C.I. pipe work (for Braddell Road & Bart ley Road pumping stations & Kim Chuan east works) Switchgear
Cabling (for Braddell Road & Bartley Road pumping stations)
B. TREATMENT WORKS
Sum Mun Kum
Kwong Soon Wing Kee Completed Engineering Works Ltd.
I
|
Guthrie & Co. (S) Ltd.
R.E. Morris & Co. Ltd.
Completed
-op-
438,000
60,000
Site preparation for Kim Chuar Swee Construction & Completed east works
970,000
Transport Co.
Sewage treatment units
Woh Hup Ltd.
Running
3,601,000
Supply and installation of aera Alliance (M) Engineer- Running tion equipment
1,111,000
ing Co. Ltd.
Supply of C.I. pipework
Kwong Soon Wing Kee Completed Engineering Works
514,000
Sludge scraping mechanisms Compressor house machinery
Guthrie & Co. (S'pore); Running
334,000
Harrisons Lister
Running
1,430,000
Engineering Ltd.
Compressor house & administra Lee Kim Tah & Co. Running tion building
1,288,000
Sludge digestion tanks & wash- Union Construction Co. Running water tower
2,876,000
Supply and delivery of C.I. pipe- Kwong Soon Wing Kee Running
218,000
work
Heatamix units
Engineering Works
Guthrie & Co. (S'pore) | Running Ltd.
1,000,000
R.E. Morris & Co. Ltd. Running
240,000
C. EFFLUENT OUTFALL AND
SLUDGE MAINS
Preparatory works for effluent Hup Poh & Co. outfall
Completed
58,000
Supply and delivery of 18 in. & Hume Industries (F.E.) 51 in. dia. steel pipes (for Con- Ltd.
-do-
674,000
tract No. 3)
Effluent outfall (part)
Lian Hup Han
do
846,000
Sludge mains (part)
Supply and delivery of 18 in Hume Industries (F.E.) and 60 in. dia, steel pipes (for Ltd. Contract No. 5)
-do-
363,000
Effluent outfall (part) Sludge mains (part)
Swee Construction & Transport Co.
-do-
998,000
In-
-do-
270,000
Cabling
Supply and delivery of 45 in. Asia Engineering dia. steel pipes and specials dustries Ltd. (for Contract No. 7) Effluent outfall (part)
Sludge mains (part)
Swee Construction & Running Transport Co.
374,000
Swee Construction & Completed Transport Co.
164,000
S $24,742,000