Immediately adjoining the first wing, and to its west, lies the second
This consists of stage.
а covered playground at platform level, adminis- tration rooms and entrance hall at
Plan at Road Level + 2
leads directly to the St. Francis extension.
Kennedy Road, which required the last September, a client requirement more floors, each of 3 classrooms, at construction of a 70 feet high retain- was the addition of a lift, serving all a later date. Construction of this ing wall.
floors, at the east end of the school. stage will commence early this year From the lowest lift lobby a path
Provision is allowed for still further An enclosed court is Hospital.
visualised linking the second and The third stage of the development third stages with a chapel, sisters
a wing to the north will add to quarters and a large assembly hall. road level, classrooms and a domestic the school a covered playground, a The third stage assembly hall will science room on the first floor, and road level assembly hall leading off then be converted to classrooms. physics and chemistry rooms on the the entrance hall, and 3 classrooms Stage I is constructed of reinforced second floor. During the course of at the first floor level. Provision has concrete cross-walls at classroom cen- this stage of construction, completed been made for the addition of two tres of 24 feet, and with cantilevered