board in the window panels, and wash- ed granolithic finish to paving.

Internally, in areas other than the studio suites, the walls are plaster or wood, the ceilings primarily lay-in panels, and the floor covering vinyl- asbestos tiles.

In the studios the walls are plaster ed brick or concrete with acoustical panelling applied to the surfaces to achieve the required sound environ- ment. In the studios other than the audience studio the acoustical treat- ment is primarily carpets on the floors, 'picture' panels on the walls - which are movable and are of three types of absorbency: low, mid and upper fre-

quency, thus allowing some adjustment - and plaster ceilings with a suspend- ed wood slat diffuser ceiling carrying the lights and AC diffusers.

The audience studio has vinyl- asbestos floor covering with a carpeted seating area and open-weave jute car- peted walls with fixed diffuser panels and a shaped plaster diffusing ceiling.

Radio Hong Kong's new logo, de- signed as a wall plaque for the new headquarters, but also to be used on the station's microphones and letter heads, is worthy of mention. Shown on page 15, it depicts on an almost solid ring the letters RHK linked to the Chinese characters for Radio Hong

Kong. The design was executed by Mr. Bob Hookham in consultation with the architect.

Contractors

Yue Shing Construction Co. were the main contractors. The contract commencement date was February 5, 1968 and RHK had to vacate Mercury House by the end of March 1969. This required substantial completion by the end of January 1969 to allow all radio equipment to be installed and tested to meet an 'on air' date of March 3, 1969.

Principal sub-contractors for the building were:

HONG KONG GOVT.

N.J. PAPPAS & ASS., Montreal, in association with PWD, Hong Kong

IAN CAMPBELL, DA (Edin), ARIBA, MASA

LANGDON EVERY & SEAH

YUE SHING CONSTRUCTION CO.

AMERICAN ENGINEERING CORP.

owners

architects and engineers

partner in charge

quantity surveyors

main contractor

air conditioning

Longitudinal section

Ф

10

Lower ground floor

Far East BUILDER, June 1969

25

26

23

M

22

2.

24

1.

Production studio 'A'

2. Control room

3. Entrance lobby

4,5. Recording suite

6,7,8,9. Continuity suites 10.

Corridor

11. Chinese and English

record libraries

12. Central control room 13. Corridor

14.

Production studio 'B'

15. Production studio

16. Programms operations

office

17.

18.

Announcers

Conference room

19,20. Toilets

21. Producers

22. Storage

23. Air-conditioning plant

24. Record library

25. Transformers

26.

Generators

27. Receipt and despatch

28.

29.

27

28

area

Kitchen Canteen

29