Contracts awarded

HONG KONG GOVERNMENT

Construction of main storm water Ching Hing Construc- drainage in Area 9, Castle Peak New tion Co., Ltd.

Town Stage IA. $684,462

Construction of new sub-divisional Tat Cheong Hong police station. Aberdeen, Hong Kong.

$1,040,014

Construction of road from Tai Mei Chi Fuk Construction Tuk to Chung Mei: Luk Keng-Tai Mei Co.

Tuk Road, Stage I. $1,473,870

Supply of metal windows and doors Dodwell & Co., Ltd. for Government Offices, Murray Bar-

racks. $399,513

Site formation for the Prisons Depart- John Lok & Partners ment Mental Hospital and the Mental Defectives Home at Tai Lam Chung.

$378,749

Completion of Lung Cheung Road Ex- Waking Builders Ltd. tension, Stage and Hammer Hill

Road widening. $558,791

Electrical installation for Government The

Grandeur Elec-

Low Cost Housing Estate (blocks 1-8 trical Co. and estate schools 1, 2 and 3) at Un

Chau Street, Kowloon. $930,930

Construction of Yuen Long Eastern Sunfok Construction Roundabout. $367,237

Co.

Construction of a landing at Tathong Wide Project Engineer. Point. $168,878

ing & Construction Co. Tsing Yi Island Indus- tries Ltd.

Supply of asbestos cement goods for Un Chau Street Goverment Low Cost Housing (blocks 1-8 and estate schools 1, 2 and 3). $905,720

Pilling to foundations for Government Gammon (H.K.) Ltd. Low Cost Housing (blocks 9-12 and estate school 5) at Lei Muk Shue, New Territories. $600,360

Construction of roads and drainage Hop Kee Construction works in Marble Road and Tin Chiu Co. Street fronting King's Road Play- ground, phase 1. $77,000

Hing Con-

Stormwater drainage improvement Cheong near Hok Lo Village, Kai Tak. struction Co. $147,241

Supply and installation of 4 passenger Hitachi Elevator En- lifts and 1 goods lift at Canton Road gineering Co. (HK) Fire Station. $484,300

Ltd.

Construction of Workshop Extension Dao Kee Building Con- to E. & M. Workshops at Sung Wong tractors (Shanghai) Toi Road, Kowloon. $198,337

Construction of Additional Mezzanine Overseas Construction Floor at Caroline Hill Workshops, & Engineering Co. Hong Kong. 649,219

Construction of R.A.F. Welfare Centre Dao Kee Building et Sunderland Road, Kowloon. $66,723 Contractors (Shanghai)

Construction of Yau Ma Tei Com- Wah Tai Co. munity Centre Recreation Area, Kow-

loon. $39,757

Sinking of a Borehole Well at E. & M. Hong Dao Sui Tsuen Service Depot. Silvermine Bay, Lantau Co.

Island. $11,725

Supply & laying of Mastic Asphalt British Orient Ltd. Roofing for Block 31 and Estate School No. 7, Sau Mau Ping Resettle- ment Estate (Stage II), Kowloon. $21,839

Supply of metal windows for 3 No. Kam Moon Metal Estate Schools attached to Blocks 1- Windows Co., Ltd. 8 incl. at Un Chau Street (Cheung Sha Wan) Government Low Cost Housing, Kowloon. $32,040

Supply and installation of 2 No. Pas- Hitachi Elevator senger Lifts at Kai Tak Airport Ter- Engineering Co. minal Building Extension over East (Hong Kong) Ltd. Transit Lounge, Kowloon. $184,600

Supply and installation of a refrigerat- The British General ing plant for Post Mortem Cold Room Electric Co., Ltd. at Cheung Sha Wan Abattoir, Kowloon. $14,516

Far East BUILDER, June 1968.

Supply of adjustable metal louvre Hing Yu Metal Works window frames for Kwai Chung (Area

9) Government Low Cost Housing, Blocks 1-6 incl., New Territories. $121,512

Electrical installation for Air Terminal The Empire Engineer- Building over East Transit Lounge at ing Co., Ltd.

Kai Tak Airport, Kowloon. $112,456

Supply and laying of mastic asphalt Precast Products Ltd. roofing for Air Terminal Building Ex- tension over East Transit Lounge at

Kai Tak Airport, Kowloon. $18,945

Electrical installation for Approved The Empire Engineer- School for Boys at Kau Wah Keng, ing Co., Ltd. New Territories. $64,877

Installation of airconditioning plant American Engineering for Operating Theatre (3rd Floor), Corpn., Fed. Inc. Tsan Yuk Hospital, Hong Kong. U.S.A. $27,700

Supply of metal windows and doors China for the Gurkha Married Quarters at Ltd. Gallipoli Barracks, New Territories. $65,300

Steel Works

Electrical installation at Morse (Ta Ku Central Enterprises Ling) Park, (Phase II), Kowloon. Ltd. $13,650

Supply of adjustable metal louvre Hing Yu Metal Works. window frames for Wong Chuk Hang

low cost housing, blocks G & H, Aberdeen. $36,289

Supply and installation of humidifiers China Cold Storage & for Wool Workshop Bldg., H.K. Engineering Co., Ltd. Technical College, Hunghom, Kowloon.

$12,115

Supply and laying mastic asphalt roof- Precast Products Ltd. ing for Blocks 1, 2 & 3 and 1 No. Estate School at Shek Lei Resettle- ment Estate (Stage 1) Area "A", New Territories. $47,820

Supply and laying floor and wall tiling Shun Shing Building for 24-Bed Urban Clinic and Maternity Construction Co. Home, Chai Wan, Hong Kong. $20,519

al

Airconditioning modification for Coloni- American Engineering

Secretariat Training Unit Head- Corpn. Fed, Inc., quarters, Lee Gardens, Hong Kong. U.S.A.

$77,430

Supply of hollow core flush doors for Tat Cheong Hong Government Low Cost Housing (Blocks

G and H) at Wong Chuk Hang, Aber- deen, Hong Kong. $16,368

HONG KONG HOUSING AUTHORITY

Wah Fu Estate, Phase IVb

Gêneral contract. $11,000,385 Metal windows and doors. $233,994 Metal louvres. $38,651

1

Pressed steel doors. $17,995 $17,995

Electrical installation. $363,100

Asphalt roofing. $63,511 Fire service installation. $44,032

Ma Tau Wai Estate

Wan Hin & Co., Ltd.

China Steel Works Ltd.

Canton Metal Window Manufacturing Co., Ltd. and Canton Metal Window Manufacturing Co., Ltd. and China Steel Works Ltd.

The British General Electric Co., Ltd.

Vai Cheong Co. Victory Manufacturing Co.

Construction of market stalls. $18,100 Luen Sang Construc-

tion Co.