Supply & laying of mastic asphalt roofing to Resettlement Housing at Tin Wan. Aberdeen. (Blocks Nos, 8, 9, 10, 11, 12. 13. 14 & 15). Supply & installation of mechanical extract system at Service Block
kitchen. Castle Peak Hospital. Kowloon.
Supply & laying of mastic asphalt roofing to Medical Officers' Quar
ters in Mental Hospital, Hong Kong.
Supply & installation of one electric goods lift at Radio Hong Kong.
Wellington Barracks. Hong Kong.
Supply of steel windows to Urban Services Depot at Sai Yee Street,
Kowloon.
Electrical installation for Resettlement Department staff quarters, Tai
Wo Hau, Stage III. New Territories.
Site investigation on site for erection of Urban Services Depot at
King Ming Road, Causeway Bay. Hong Kong.
Electrical installation at Air Radio Station. Tathong Point. Hong Kong Supply of metal windows for Resettlement Housing at Chai Wan
Stage III (Area "A").
Supply & laying of mastic asphalt roofing to Social Welfare Depart-
ment Food Kitchen at Hung Hom, Kowloon,
Supplying & laying of mastic asphalt roofing to Resettlement Hous- ing at Chai Wan Stage III. Area "A" (Blocks 5, 6, 7 and 8), Supply of crushed stone for District Office, Tai Po
Supply of crushed stone for District Office, South
Supply of crushed stone for District Office, Tsuen Wan
Supply of Onoda cement
Supply of crushed stone for Agriculture & Forestry Department Supply of Lo Wu bridge roofing materials
Supply of Portland cement
Supply of manually operated electric pumpset
Supply of Portland cement
FEBRUARY 1964
Supply of steel pipes and specials for Sham Chun Scheme (Stage
(additions)
Shap Pat Heung Road widening, Stage I (Yuen Long Main Road to
Kwong Ming School)
Construction of Kowloon Central Post Office
Construction of four blocks of Type II Government Quarters at
Magazine Gap
Laying of 54" diameter pipeline from River Indus to Tai Po Tau,
Section "A"
Laying of 54" diameter pipeline from River Indus to Tai Po Tau,
Section "B"
Laying of 54" diameter pipeline from River Indus to Tai Po Tau.
Section "C"
Construction of domestic low cost housing at Ngau Tau Kok Area
"B" (Blocks 9
12)
Construction of road works in Tsuen Wan South (No. 4 Contract) Laying of 15" and 10" dia. A.C. mains from Aberdeen Service Reservoir (T.W.L. 272,2) to Little Sisters of the Poor Convent at Aberdeen
Laying of 18" dia. A.C. main from 23-1/2 M S. to 26-1/2 M.S. Castle
Peak Road to Yuen Long, New Territories
Construction of Block F. Ham Tin Resettlement Estate, Area ‘A .. Repulse Bay Road Widening (Bridge over Beach Road) Supply of labour for the operation of the sand classifier at Cheung
Sha Wan temporary sand depot
Construction of an arched roof over Bridge No. 38 at Lo Wu
Station of the Kowloon-Canton Railway, British Section
Construction of Choi Hung Bus Terminus
Manufacture of castings for Aberdeen flushing supply Manufacture of C.I. Fittings for Salt Water Fire Mains
Construction of 3 Nos. 1000-gallon underground petrol storage tanks Electrical installation at Police Rank & File Quarters at
Kennedy Town
Supply and installation of three passenger lifts at Resettleuent
Housing at Tung Tau. Stage II, Block "M" Electrical installation at Tsz Wan Shan Resettlement Estate. Area
E. Block El
Pilling to foundations for Tsz Wan Shan Resettlement Housing.
Block F 1
Supply and installation of three passenger lifts at Queen Mary
Hospital extension
Supply of steel pipes and specials for Supply Basin Pumping
Station
Plover Cove Water Scheme
Fabrication of 55" O.D. M.S. specials for Sham Chun Scheme,
Stage II
Construction of a six-seater aqua privy at Choi Uk Tsuen, Yuen Long Supply and laying of mastic asphalt roofing to 13th Floor, West
Wing. Central Government Offices, Hong Kong Supplying and laying of asphalt roofing to 24-Classroom Secondary
School at Snau Kei Wan
Supplying and laying of mastic asphalt roofing to Resettlement Housing at Kwai Chung Area "C" (2nd Contract) Blocks 16. 17. 18 and 19
Supplying and laying of mastic asphalt roofing to Resettlement Housing at Yau Tong Bay Area "A". Blocks 4, 5, 6, 7, 8 and 9 Sinking 1 No. Borehole Well at Yuen Long Divisional Police Station Supply of metal windows, doors and flyscreens for Resettlement
Department Staff Quarters, Tai Wo Hau, (Stage III)
Contractor
Bowring Co., Ltd.
Precast Products Ltd.
Yee On Hong Co., Ltd.
Canton Metal Window Mfg. Co. Ltd
British General Electric Co., Ltd.
Malayan Drillers (H.K.) Ltd.
Amount
Sino-British (Hong Kong) Ltd
61.426
6.500
13,372
45,800
46,548
12,970
15,416
22,025
14,492
7,275
34,956
33,250
18,737
8,820
delivered
9,500
C.I.F. H.K.
10,650
14,883
T. S. Lau Electrical Engineering Co.
Canton Metal Window Mfg. Co., Ltd.
Dreyer & Co., Ltd.
Sino-British (Hong Kong) Ltd. Kin Wah Transportation Co South East Asia Quarry Co. Star Quarry Co.
Sumitomo Shoji Kaisha, Ltd.
Star Quarry Co.
Swire Maclaine Ltd.
Green Island Cement Co., Ltd.
Dreyer & Co., Ltd.
Green Island Cement Co., Ltd.
Union Construction Co.
Wo Hing Construction Co Lai Kee Co.
Nam Hing & Co.
approx. C.I.F. H.K. 50,000 Ex. Works 11,220 delivered
7,000
Ex. Works
Sumitomo Shoji Kaisha, Ltd.
Hung Mau Construction Co. Lai Kee Co.
1,212,054
433,320
6,338,391
Sang Hop Construction Co. Ltd.
7,426,180
Lam Construction Co.
1,724,173
Union Construction Co.
1,220,275
991,645
Cheong Lee Construction Co. Ltd. Chi Fuk Construction
8.940,475
776,880
Lingking Brothers
& Co.
126,086
252.620
6,145,402
216,048
Lingking Brothers & Co
77,275
Lee Yuen Construction Co.
85.839
Winsome Co. (Engineers & Builders) Ltd. Wang Tak Engineering & Shipbuilding Co. Ltd. Wang Tak Engineering & Shipbuilding Co. Ltd. Cheoy Lee Shipyard
325,970
11,250
44.472
13,050
Hip Hing Electric Co.
305.409
British General Electric Co. Ltd.
186,000
Winsome Co (Engineers & Builders) Ltd.
423,000
Vibro Piling Co. Ltd.
1,022,150
The Jardine Engineering Corp. Ltd
239,100
Sumitomo Shoji Kaisha Ltd.
829,931
Wang Tak Engineering & Shipbuilding Co. Ltd. Liang Yuk Construction Co.
6.934
10,630
Luen Tak Co.
13,815
Luen Tak Co.
16,925
37,668
44,817
9.100
Luen Tak Co.
Luen Tak Co.
Hong Kong Well Boring & Engineering Co.
Canton Metal Window Manufacturing Co., Ltd. 11,757
140
(Continued on page 142)