AFE DEPOSIT

terior partitioning etc., the cubic cost working out at approximately $7.00 per cubic foot.

▲ Entrance to the safe deposit vaults.

the structure was approximately $20.000.000. including lifts. air- conditioning. lighting fittings. in- ▼ Private staircase from working space to management floor.

The Bank occupies the first. second and third floors and the penthouse on the roof. Total cost of