Photograph of the living! dining room.
ly important point when a microphone is being used for recording. The other speaker is fed from the main radio ampli- fier which can accept inputs from Rediffu- sion, radio, tape recorder or gramophone pick-up. Sound is diffused along the end wall and appears to come from both speakers. Resonance and boom appear to be absent.
The cost per cubic foot works out at $2.49.
The architect was Mr. J. F. Ho- worth of Messrs. Leigh & Orange.
General Contractor: Tom Construction
Co.
Gilman
&
The fireplace wall of the living room.
Electrical Installation: Hemco. Philips Kerosene Cooker:
Co., Ltd.
Coleman Oil Fired Heater: American
Engineering Corporation.
Sanitary Installation: Dodwell & Co.
Ltd.
Waterproofing: William Jacks & Co..
Ltd.
Metal Windows: Canton Metal Window
Mfg. Co., Ltd.
Gas Installation: The Hong Kong &
China Gas Co., Ltd.
Hardware: Shewan, Tomes & Co., Ltd
Terrazzo Floors: Raoul Bigazzi. Composition Floor Tiles: Hope & Co. Glazed Wall Tiling: Grand Traders,
Ltd.
GOVERNMENT CONTRACTS AWARDED
NOVEMBER, 1955
Particulars
Construction of Steward Road Pier District branch office. Shumshuipo
November, 1955 January, 1956.
Drainage works in Castle Peak Road, Tsuo Wan Box Culvert, Tai Hang Tung
Surfacing of Castle Feak Road between milestones 5-2
and 91
Reinforced concrete box culverts, Hung Hom reclama-
tion
area
DECEMBER 1955
Site formation, Ping Shan Hospital
Construction of a reinforced concrete box culvert and
other drainage works in Aberdeen
Access Road from Shum Wan to Kun Tong Nullah Water main. Lai Chi Kok Gap-Diamond Hill
Kau Wa Kang Pumping Station and balance tank
Construction of bridge at Ho Chung
Repair of bridges No. 7 and No. 20
Water main. Bowen Road
Widening of jeep track from River Jordan to Shum
Wan
JANUARY, 1956
Tsun Wan Primary School
Quarters for rank and file, Western Police Station
Supply of cement
Castle Peak Hospital, (stage 1)
Tai Lani Chung catchwater tunnel
Supply of bitumen
40.
―
Maintenance of port works
Resettlement flats, Li Cheng Uk (phase II)
Supply of mild steel rods
―
do.
Room air cooler and ventilation, Central Magistracy
Room air coolers for Government offices
Lo Foo Hang dam
do.
Maintenance of waterworks
Contractors
Wa Hing Construction Co. Sang Hop Construction Co. Tak Hing Co. Wan Hin Co.
Union Construction Co.
Wan Hin & Co.
Sang Lee & Co. (145)
Kwan On
Amount $ 133,966.10
385.418.00
477.525.10
293.801.20
1,125.777-50
377,643-00
390,451.00
Cheong Lee Construction Co.
169.540.00
Winley Construction Co.
104.400.00
Lun Sang & Co. Ltd.
1.589.314.00
Ching Hing Construction Co. Ltd. Hang On Tai
065,014.40
170,703.00
Tak Hing Co.
41,936.50
Tak Hing Co.
269,035.50
248,786.00
Yee Lee & Ca.
442,805.29
Cheong Hing Co.
1,275,796.00
Green Island Cement Co. Ltd.
160,000.00
Sang Tai Co.
Sang Lee & Co. (1945)
2,893,617.10
Caltex (Asia) Ltd.
Standard Vacuum Oil Co.
Wa Hing Construction Co.
Steel Brothers & Co. Ltd.
Shun Fung Ironworks Ltd. International Engineering Ltd. International Engineering Ltd. Lam Construction Co. Hang On Tai
486,344.00
Kin Yick Lung Const. Co.
250,000.00 250,000.00
33
Wan Ilin & Co.
568.755.92
1,152,000.00 148,000.00
200,000.00)
2.883.383.17 410,000.00 360,000.00
3.175.00 To..100.00