A cross-section through the hall, living room and verandah, showing the relative heights of ceilings,
On this basis, in order to provide a fair return of in- vestment, depreciation and repairs of the building, amortisa- tion of principal, etc., a fair rental to the investor would be $600 to $700 per month, a figure which is beyond the scope of the class of people it would be designed to accommodate therein.
A brief itemised schedule of quantities for the bungalow illustrated in this article is given below,
The specification is based on a good standard of workman- ship and fittings. As will be seen, teak parquet flooring, metal doors and windows, and plastering and decoration work of the quality generally expected for European type of dwelling, have been provided for. Bathroom fittings are of good quality.
The rates quoted are those ruling at the moment and are based upon quotations received from reliable European and Chinese contracting firms.
Item No.
Description of Work
1. Footing trenches excavation and
filling (4 ft.)
2. Footing clinker concrete 1:3:5 3. Floor concrete (clinker mix-
ture) 1:3:6
4. VI-CON Block Wall (footing and
parapet including rendering):
(a) 9" Wall
(b) 6" Wall
(c) 3" Wall
5. Hollow Tile R.C.C. Roof Slab:-
(a) 7" Hollow Tiles
Quantity Rate
Amount
cu. ft. 4,200
,10
"
1,050
2.00
420.00 2,100.00
"
1,300
2.00
2,600.00
Hoed
NONPORITE
NONPORITE
Specialised
BUILDING PRODUCTS
fot
WATERPROOFING
Cement Mixes-Integral and Surface.
FLOOR TREATMENTS
Anti-slip; Metallic Hard- ening; Acid and Chemical Proofing.
JOINTINGS and CAULKINGS
Weather Sealings; Expan- sion Jointings; Acid and Alkali Proofing; Heat and Oil Proofing.
Sole Agents
Shewan Jomes & Co., Ltd.
Tel. 27781
Chung Tin Building
PAL
**
sq. ft. 5,000 1.60 160 1.40 720 1.00
8,000.00
"
224.00 720.00
sq. ft.
1,380
1.00
1,380.00
(b) 4"
do.
13
1,500
.70
1,050.00
(c) 1:2:4 cement concrete
cu. ft.
1,100
3.00
3,300.00
(d) Steel
lbs.
6,480 .50
3,240.00
(e) Formwork and shuttering sq. ft. 2,880
.50
1,440.00
6. R.C.C. Beams 9" X 18":-
(a) 1:2:4 cement concrete
cu. ft.
225
3.00
675.00
(b) Steel
lbs.
1,540
.50
770.00
(c) Formwork
sq. ft.
750
.50
375.00
7. Precast R.C.C. Lintols:-
(a) 9" Lintol with canopies
F.R.
80
8.00
640.00
(b) 9" Lintol 9" X 9"
F
136 3.50
476.00
(c) 3" X 6" Lintols
20 1.00
8. Standard Metal Windows
Standard Metal Doors
9. Teak front doors
Flush inside doors
sq. ft.
414 7.00 46 12.00
20.00 2,898.00
37
30 10.00
康中
552.00 300.00
223
Teak Garage door
8.00 79 10.00
1,784.00
53
790.00
Hardwood doors to Servants'
Quarters
185 6.00
1,110.00
11, 1" Teak parquet floor
cove
12. Teak window cills
10. Cement render floor for parquet
Smooth render floor to Garage
and Servants' Quarters
Cement skirting and dadoes
3/4" X 5" Teak skirting and
1,550
.30
465.00
370
.40
148.00
280
17
.50
T
1,550 2.50
140.00 3,875.00
F.R.
350
Teak Pelmets
13. 1" X 1" Mosaic tile floor for
Bathroom, and Pantry
3" X 6" White glazed tile
dadoes to above
*
1.50 100 2.00
110
++
3.00
525.00 200.00 330.00
sq. ft.
245
4.00
980.00
Cement tile floor and skirting to Hall and covered verandah
530 3.00
1,040 2.00
1,590,00
2,080.00
ceiling inside
15. 4-Ply waterproofing to roof
17. Fireplace Surround
14. Plastering:—
(a) Cement plaster outside (b) Lime plaster walls and
16. Painting and Decoration Work Allow
No.
18. Plumbing & Sanitary Installation Allow
19. Electrical Installation
13
sq. ft.
4,100 .40
8,780 .30
sq. ft. 3,500
.50
1,640.00
2,634.00 1,750.00
།
1,500.00
350.00
20. Miscellaneous Expense
5,000.00
1,500.00
1,429.00
$61,000.00
OPAL
OPAL
SYNTHETIC
ENAMEL
WREKT PAINT COLOUR & MANISH LOZ
PAINTS
"The Key To Decoration with Preservation”
General Agents
BUTTERFIELD AND SWIRE
HONGKONG & SHANGHAI
Agents
HENRY WAUGH & CO., LTD. Singapore & Malaya THE BORNEO CO., LTD.
Siam
THE EAST ASIATIC CO., LTD. Siam & Philippines
No comments yet.
Private notes are available after approval.