No_4_December_1963 — Page 22

Far East Builder 遠東建築雜誌 All

NOW SANDERS AND FORSTER COMBINE..

THREE ADVANCED TECHNIQUES IN

THE PRODUCTION OF

STEEL FRAMED BUILDINGS.

'S&F' CLEARPORTAL BUILDING TIED PORTAL, CRANE, ARCHED ROOF AND MONITOR ROOF BUILDINGS ALSO AVAILABLE

COMPUTER DESIGN-SAVES MATERIAL

All designs for Sanders and Forster's steel framed buildings are calculated by electronic computer. This selects the minimum economic weight design for any specified loading conditions.

AUTOMATED FABRICATION-SAVES LABOUR

In Sanders and Forster's modern workshops, mechanised conveyors, production line methods and semi-automatic machinery, reduce production costs to a minimum.

SHOT BLASTING & METAL PRIMING-SAVES MAINTENANCE

The main steelwork in Sanders and Forster's steel framed buildings is positively cleaned by shot blasting and immediately treated with a metallic zinc epoxy primer.

This outstanding advance on conventional methods of protecting steelwork, greatly extends the life of any painting system, thereby reduces subsequent maintenance.

Send for illustrated brochure

Barbour Index File No. 310

SANDERS AND FORSTER-FOR PROGRESS IN STEEL

SIF SANDERS & FORSTER LTD.,

Bridgwater House, Warton Road, London, E.15 Tel. Maryland 8811

Agents for Malaya, Singapore, Borneo, Brunei, Sarawak: Harper Gillfillan. Agents for Ceylon: Brown & Co.

Cleaned steel sections leav-

ing the shot blasting plant

A CHAMBERLAIN GROUP COMPANY

20

20

THE HONG KONG & FAR EAST BUILDER-VOLUME 18, NUMBER 4

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.