future installation of toilet facilities to serve the factories.

Ground floor frontage has been set aside for shops and showrooms while the rear of the ground floor and the first floor have been left for flatted factories. These are the only two floors with set functions.

At ground floor level, the building is divided into three sections by a two storey high vehicular

vehicular exit- entrance leading to the ramp at the rear and by an open yard running off this throughway.

All three sections are linked up by the second floor level, and the build- ing retains this appearance to roof level.

The new building is being con. structed as phase I of a three stage development plan on a triangular piece of vacant land beside Green İsland's main Hong Kong factory.

Phase 2 will consist of a theatre building and offices and phase 3, a factory. Work on phase 2 is expect ed to begin soon.

Cost of the new building, including piling. lifts and other fittings, should be about $7 million which would give a cubic foot cost of approximate- ly $1.50. (Building volume will be 5,038,000 cubic feet.)

Main contractor for the building is the Ngo Kee Construction Co., and other sub-contractors and sup- pliers include:

PILING: Franki Piling and En- gineering (H.K.) Ltd.

LIFTS: The British General

Electric Co. Ltd. (Fiam).

PLUMBING & FIXTURES: Lee

Yu Kee Ltd.

Steel Works Ltd.

METAL WINDOWS:

LOUVRE WINDOWS:

Boag & Co., Ltd (AGCO).

China

Davie,

r

BAILEY

ST.

SEA

STEEL ROLLING SHUTTERS:

Shewan, Tomes (Equipment) Ltd. (Slaets)

ALUMINIUM WORK: East Asia

Aluminium Co.

TILES: Hung Tat Co., China En- gineering Co., Ltd., and Tonson of Hongkong Co.

FLOOR HARDENER: Tai Yip Engineering Co. (Steel-Crete).

This picture of the new car park- factory building was taken last month. Construction should be completed within three months.

THE HONG KONG & FAR EAST BUILDER-VOLUME 18. NUMBER 4

K.M.L. 69

115:

4163

MA

CHUN TIN ST.

646

635

TAU

PAK KUNG ST.

HOK

YUEN

ST

WEI

140

Ty

་་ ་་

L

TAMAS

Ľ

H

J

L

L

0 0

L

K.M.L. 40 R. P.

TSING CHAU ST.

ROAD

KEY

PLAN

S

C

200

400

600

800 FT

TEM

125

H

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.