Manufacture of draw-off pipes and valves for Shap Long Dam
Cheung Chau Water Supply Extension. Stage I
Flood Control, Stage I
SEPTEMBER 1962
Supply of radio distribution system for Queen Elizabeth Hospital Supply of radio paging system for Queen Elizabeth Hospital Supply of electric fans Construction of a revenue
station at Tai Lam
Construction of Paterson Street (section from Great George Street
to Public Pier No. 45)
Construction of roads in Kwun Tong Housing Zone III includ- ing Hip Wo Street and Kwun Tong/Hip Wo Street Roundabout Construction of nullah (final section) Yuen Long Flood Con-
trol, Stage V
Construction of roads and drains, Stage 11 at Tsz Wan Shan
Resettlement Estate
British General Electric Co., Ltd. Westrex Co., Asia China Engineers Ltd.
Ahong Construction Co. (H.K.) `Ltd.
Wing Lee Construction Co.
$ 135.064
41.913
39.000
341,700
161,104
Wing Lee Construction Co.
489.916
1
Union Construction Co
667.236
Yau Wing Co. Ltd.
1.444.140
Reconstruction of Sha Tin Pass Road
Winsome Co. (Engineers & Builders) Ltd.
522,520
Construction of roads and drains at Kwai Chung Area
Re-
Union Construction Co.
1.268.596
settlement Estate
Reconstruction of Tung Lo Wan Road. Stage I
Wan Hing & Co.
124.801
Laying of trunk mains in Oxford Road. Kowloon Construction of Tsz Wan Shan Service Reservoir
Lam Construction Co.
190.648
Kwan On
3.596.910
Wang Tak Engineering & Shipbuilding Co. Ltd.
10.979
Construction of the final section of main nullah
Yuen Long
Fook Lee & Co.
1,373,550
446.514
6,200.020
-
10,792,804
303.904
139.536
246.543
1,373.770
163.099
Jardine Engineering Corporation Ltd. Tung Yuan Hong
5.712
208.009
Franki Piling and Engineering (H.K.) Ltd. .:
International Engineering Ltd.
1,024.655
159.900
Siemssen & Co. (Hong Kong) Ltd.
Hopkins & Co.
354.510
c.l.f. H.K.
53.200
18.12
Construction of service reservoir and laying of mains at Rennie's
Mill Construction of Police Married Quarters for Rank & File, Tanner
Road, North Point
Construction of low cost housing at Wong Tai Sin Area 'C' Improvement to junction of Gascoigne Road/Jordan Road and construction of internal roads for Queen Elizabeth Hospital Reconstruction of Sai Yeung Choi Street (Dundas Street/Argyle St.) Reconstruction of Wellington Street and Lyndhurst Terrace Construction of seawall fronting To Kwa Wan Reclamation Site formation and drainage works for Piper's Hill development,
Phase Supply of universal beams for bridges. North Point and Kowloon
City Vehicular Ferry Piers
Electrical installation at Wylle Road Government Quarters Piling to foundation for Valley Road low cost housing
Supply and installation of sea water mains at Queen Elizabeth
Hospital
Supply of 21" steel pipes and specials for North Point/Shau Kei
Wan supply, Stage II
Supply of manhole covers
Construction of two six-seat aqua privies at San Tin and Nai Wai.
Yuen Long District
Construction of concrete footpath from Tai Mong Tsai to Wong
Keng Tei, Sai Kung District
Supply and laying of mastic asphalt roofing to Tai Wo Hau Silk
Weaving Factory, Kowloon Electrical installation
Territories
for Police Posts in Deep Bay Area. New
Electrical installation for Revenue Station at Tai Lam, New
Territories
Light weight concrete works to 6th Floor. East Wing. Central
Government Offices. Hong Kong
3 No. 1-ton Electric Chain Hoists for Medical Store. Pok Fu Lam Sinking of 1 No. borehole well at Maple Street Latrine & Bath-
house, Kowloon
OCTOBER 1962
120
Supply and installation of steam service piping at the Queen
Elizabeth Hospital
Supply and installation of kitchen equipment at the Queen
Elizabeth Hospital
Construction of Robert Black Health Centre at San Po Kong Construction of sea-water pumphouse at West Point for Western
Magistracy
Construction of Garden Road Subway
Construction of latrine at Tai Po Old Market
Construction of roads within M.L. 703
Water Supply to Tong Fuk Short Term Prison. Lantau
Construction of low cost housing at Cheung Sha Wan, Stage II Construction of three blast deflection screens at Kai Tak Airport Construction of bulk fuel storage tank for Tsz Wan Shan Pumping
Station
Construction of Police Rank & File Married Quarters at Tsuen Wan Construction of drainage works in Victoria Road (from I.L. 6666
to Mt. Davis Road)
Construction of roads and drains in San Po Kong Industrial Area Reconstruction of Nga Tsin Wai Road. Nam Kok Road and Car
penter Road
Construction of drainage works in Sze Mei Street, San Po Kong Construction of roads in connexion with Tat Chee Avenue de-
velopment
Construction of temporary sand depot at Cheung Sha Wan So Mo Ping sile formation. "B" Contract, Kwun Tong Construction of drainage works in Kwun Tong Housing Zone II Construction of 3 sets of radial gates for Tai Lam Chung Catch-
waters Section C
Reconstruction of south wall of Kai Tak Nullah
Union Construction Co.
Wan Hin & Co Ltd Wan Hin & Co. Ltd.
Wing Lee Construction Co. China Construction Co. Kwan On
Yau Wing Co. Ltd.
Wa Hing Construction Co. Ltd.
Yuen Fung Construction Co.
Wah Hing & Co.
The Standard Co.
Ip Tim & Co.
Cheong Hing Electrical Contractors
Dreyer & Co. Ltd.
Inniss & Riddle (China) Ltd.
Hong Kong Well Boring & Engineering Co.
40.235
22.864
39.300
14.312
44.04
6.90
5,000
Taikoo Dockyard & Engineering Co.
Dairy Farm. Ice & Cold Storage Co. Ltd. Mei On & Co., Ltd.
$1.190.300
244.32
598,950
165.650
399.12
50.14
159.761
248.261
5.517.427
Yau Wing Co., Ltd. Fook Lee & Co. Hung Yue & Co Fook Lee & Co. Hung Yue & Co. Lai Kee Co.
Cheoy Lee Shipyard
Lee Tung Wo
Yick Lee & Co., Ltd.
Sang Lee & Co. (1945) Ltd.
Winsome Co. (Engineers & Builders) Ltd.
Wing Lee Construction Co. Wah Hing & Co.
48.400
25.713 i
973.61
277.645
666.900
Hung Mau Construction
204.199
196.095
Winsome Co. (Engineers & Builders Ltd. Wah Hing & Co.
Co.
137.335
190.861
2.569.665
817.345
61.119 1,359,011
+ Estimated value.
Yau Wing Co. Ltd.
Wang Tak Engineering & Shipbuilding Co.. Sang Lee & Co. (1945) Ltd.
THE HONG KONG & FAR EAST BUILDER-VOLUME 17. NUMBER 4
No comments yet.
Private notes are available after approval.