ties. The former is for normal day- time use, subject to varying degrees of security; the latter calls for maximum public use at any conven. ient hour and without special con- trols.

The plan solution therefore pro- vides two separate entrances at the ground floor with the main lobby opening off a driveway entrance from Hill Street. Due to the frequent rains, provision is made for driving under the cover of the wide overhang of the first floor. A separate entrance at the Armenian Street side serves as access from the parking area, approached under cover by means of a long arcade.

The main lobby contains an in- formation desk from which visitors' access to the lifts and stairs to the upper floors is controlled. Directly off this lobby is the consular section, concerned with the issuing of pass- ports, visas, etc.

MASCHIĞ HALL

FEET Q

CENTRAL FIRE

STATION

GRAPHIC

AREA

STREET

NT -

100

SCALE

ARMENIAN

GHURCH

HILL

STREET

YEW

STREET

3x 0 1

CHINEGE SHAMBER

SINGAPORE TELEPHONE BOARD

100

300

400

500

PLAN

SINGAPORE

CONSULATE

1 3 2 1

PARKING

мотой

count

can

TRANSFORMER MOON

MAIL BOOM

PARKING

REFERENCE

SECURIT T OFFICE

ska bol

LIBRARY

LECTION

سعة

نسا

GROUND FLOOR

THE HONG KONG & FAR EAST BUILDER-VOLUME 16. NUMBER 4

DAVEMAT

་་་

1

51