ALLED TILE
AUNI INIH BIBLI
ŞILAND
車
FIRST
FLOUR
GROUNA FIDER
SIDE ELEVATION
FRONT ELEVATION
ALL STONE WALLS TO BE BUILT IN CEM. MOR ALL CRATE BLOCK PARTITIONS TO BE BUILT IN EM ALL K. C.C BEAMS TO REST AH STANE TEMPLATES SEBERAVE PLAM JOR HELL AND WATER CÏOSITS TO BE SUBMITTED LATER
JÖ KONEIDa kan ↳ ZOLLED WILL
Lima CONCRETE
CRISTIN
WeekES NG ARANT
ALL FIRE FIGHTING APPLIANCES MUST BE MIT TO THE SATIŞFACTION OF THE C.O.F.B.
DA CANA JONE
CROSS SECTION A-A
DRAWING NO 2.
(327.10 375.
鱼
MAA
周四
FOUNDATIONA.
LONGITUDINAL
SECOND}
FIRST)
CROUND
SECTION B-8
BACK
ELEVATION
NORTH
ELEVATION
PROPOSED
ERECTION
OF
4 CHURCH
ON
K.I.L
4235 KOWLOON
SCALE BJIIT INCH.
12001
Aro
AAIL
tyā ar
周
SECOND,
EAST
ELEVATION
FIRST!
CLOUND,
24
j cole class ARAMVIEĻ
Hong Kong Builder
44Page 21
To
No comments yet.
Private notes are available after approval.