No_3_March_and_April__1950 — Page 31

Far East Builder 遠東建築雜誌 All

LAUWORY

LAUNDRY

SERY QUARTERS

BOV QUARTER

LOONT STORE

TORS &

LOBEY

ON UP

BERY QUARTERS

SON CEPARTERS

BCD RODH

1)

DINING

ROOM

A

STORE

0

Q

DINING

ROOM

*

BOX ROOM

BOX JOON

Kay

[CUPBO ANDE

MOT-ROOM'S

LIVING

Ли

В

P

1

B LIVING ADON

YE #

BED ROOM

Plan of typical apartment floor and photographs of living rooms in two different apartments

When completely equipped (depending upon deliveries of material, expected later this year) this substation will have installed 2 E.H.T. 6,600 volt switchboards, B.T.H. 250 M.V.A., one 8 panel and one 17 panel, and one low tension Ferguson Pailin switchboard of 24 circuits.

The lower basement is the transformer room, and in addition to housing four 750 K.V.A, transformers, also provides sufficient space to contain the whole of the Consumers Service Department and its stock of cookers and spare parts, and repair workshops. Also located here are store rooms for heavy materials and spares.

Referring back to the upper basement, the Substation Department workshop is also located on this floor adjacent to the Substation, together with its necessary store rooms.

The southern side of the upper basement is separated into two large divisions: -

(a) The garage with space for seven cars, for residents of the seven flats in the building, has its entrance from Ice House Street. The planning of the gradient for this was given much careful thought which has been justified by the results. The lighting installation in the garage is vapour-proof and should be considered as an example of the type necessary for all dangerous goods storage places.

(b) The Meter Store-designed to contain several thousand meters of all sizes. This room is fitted with dehumidifiers as a necessary precaution against dampness and consequent loss of accuracy of the meters. The meter pressure coils must be kept dry, for as soon as the meters are put on circuit these coils run slightly warm and therefore maintain this state.

The yard adjacent to the lower basement is now being fitted up

to contain two 7500 K.V.A. 22,000 6,600 volt transformers and their necessary equipment. These should be installed and in commission early in 1951.

As has been mentioned there are six apartments and a penthouse for the accommodation of the Company's engineers, and no effort was spared to make them comfortable and modern in every way. As might be expected, the kitchens and bathrooms are fully electrically equipped and the entire electrical installation is a model of modern and efficient planning. The plan of the flats is shown above, and as will be seen contains two bedrooms with attached bathrooms, living room and dining room with the necessary services.

Architects: Leigh and Orange.

General Contractors for site foundation: Sung Kee & Co. General Contractors for building: Hung Yue & Co. Sanitary & Fire fighting Installation: Dodwell & Co., Ltd. Electrical Installation: Jardine Engineering Corporation

Ltd.

Lift Installation: British General Electric Co., Ltd. Crittall Steel Windows: Dodwell & Co., Ltd. Pressed Steel Doors to Offices (Henry Hope & Co.):

Jardine Engineering Corporation Ltd.

Patent Roofing: Shewan Tomes & Co., Ltd. Terrazzo to Stairs and Marble Facing to Fireplaces:

Artistic Ateliers Raoul Bigazzi.

Wireless Aerial Installation: Gilman & Co., Ltd. "Gibbons" Hardware to Doors: Gilman & Co., Ltd. Pilkington Glass for Windows: Dreyer & Co., Ltd. and

R. Corney & Co., Ltd.

Sliding Shutter to Garage (Milner Safe Co.): Shewan,

Tomes & Co., Ltd.

Internal and External Tiling: Sino-British Engineering

Corporation Ltd.

Spray Painting to Lift:

Ngai Wah Spray Duco Paint Co. Glass lenses for Skylight: Sino-British Engineering

Corporation Ltd.

Meter testing room

T

29

Switch room in process of installation

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.