No_2_July_and_August__1953 — Page 9

Far East Builder 遠東建築雜誌 All

Птерод

Road level.

Ground Floor- Entrance Hall Din

-

however.

to

Second

Floor This floor 14 oc-

other Boor to Marden Ball with a Method of Service The Dining consequent increase in the accom- Hall is to be à large room with dours the balf landing with

Laundry A lundry is situated af an openiug operung on to the terrace. It will be out on to the drying area at the back. A flight of steps leads up to the light and airy and be about 150 This is for the Laundry of students entrance court situated 18 ft. above high. These advantages will be lost. clothing and for general use of the the Pokfulam Road level. From there

without an efficient at College. the Hit Laken up to the 4th Bnor of

rangement for the all important the Griffin Hull gives access

business of serving 204 hot meals tu a quadrant terrace which is on a level three tunes a day It would hardly pled by a flat for the House Master. with the ground floor of the Marden Stem practical för Individual orders. At contains a Study, Living Room, IL This It is unly necessary

in be taken by the staff and be Dining Room Kitchen. 3 Bedroomųs. collected and dellvered short

each Bax Room and a room for two amabs negotiate A comparatively

student separately alght of steps to reach the top of

It is envisaged with lavatory and shower Hall from the Postulam trolley landed with the say.

Liiat Marden

Bojne system whereby a food Firth to Eighth Flaors These four hours contain students rams Each Preliminary Delails of Accommodation should be wheeled down each of the a built-in cupboard,

different kinds of meals nh the men single room ls 0'0" x 12'0" and hus Lavalury ac- Marden fall

gingways and the students should select which they prefer Each plate showers

comodation, consisting of WC %,

lavatory hados, would have a cover to keep the dish situated on rach Door. It is proposed 13

hot and the trolley would be re- that the WC's should be European plenished from the service counter as type required

Wails and flors will be glazed Rice would be served from tiles. A heating chamber is situated a large covered container carried on on the 3rd Floor Immediately under each fruijoy.

the levatories, and It e propogad Lil install a small off fire bollar in Kitchen → The Kitchen is planned provide hot water for the showers_ with areas for Food Freparation. Conkly, Service and Wash-up. At A linen store has been shown un qutske lavatory and WC. Is provided each of the hostel doors, but I they for staff working in the kitchen. arr nut required, they may he teni for the boy's duty room on each fluer The different fuels that can be used and a Géléphone extensiom placed in are steam, Bas, electriCUS. and them for general use. Bone such o- solid fuel. This question will be in- rangement may he found necessmy vestigated when the kind and quality as the time required for a student I of food to be cooked for each meal is come from the top floor to the maln known. The type that is adopted instrument on the ground four would should also provide for an adequate block the line for long periods supply of hot water for use in the Boy's kitchen.

1st Floor

2nd Floor 3rd Floor

4th Floor

6th Finnr

6th Floor

7th Floor

-

ing Ball. Kitchens Library and Recrea- tion Room, Laundry. House Master's Flat 11 Students. Bor's Duty Room. Heating Room,

17 Students. Boy's Duty Room.

24 Students, 1 Junior Staff. Boy's Daly Room.

27 Students Duty Room

Boy's

25 Students. I Junior Stai, Bug's

Duty

Romm

Buh Floor 27 Students.

Gran R¤||

Duty Room.

Kirimnd Floor- Entrance. Chapel Recreation Room Warden's Flat

תיחה

2nd Floor

3rd Floor

4th Floor

5th Fluor

6th Murp

7th Floor

10 Students, í Juntur

Staff.

13 Students. Room

Duty

13 Students. i Junior Stan. Utility Room. Duty Room.

18 Students, Ronim

Statt.

Marden Hull, Dining Haill

Duty

لان

Utility Rooms-No provdan turs boun made for nility foonis in Mar- The food delivered in the delivery den Hall. That is a room on each

floor where the buy amid make bry and that required for immediate use can be defrosited in the stores up of tra il asked for by the stu- IL is too far to obtain Wris provided me dry goods, Vegatables dents. mest, milk fish. etc. This lafter store from the ground floor kitchen and. room should be insulated and equip provision for such a service befo ped as a chill room, Tenk bunches be provided, a small room with B with sinks will be frovided far. Food puwer plate and a sink is necessary preparation, open shelving will be li may be possible to provide this in general in the kitchen-no druwers the boy's duty rom Wash-up spare contains two sinks and dralulug Boards and space for storage of crockery.

Fire Precautions Precautions against fire will be strictly enforced In a bullding of this nature The re- guletons have been compled with The walls will be tiled 6'0" big star as the planning of the build- 18 Students. I Junior and the fours will be filled and lild ing is concerned Exit is provided al to talls with outlets for washing both ends of all corridors. Staircases down: An exhaust fan could be fixed have been cut off truo the corridors: The in an outer wall to provide mudmum by thats of swine Bre-proof doors, Daning Hall Is 556 30'0". By using ventliutim, An open areu is situated and are doors open our with brits the minimum spacing for seating at behind the kitchen to provide space on the inside witch cannot be locked 1'9′′ per person and arranging the for storage of empty bottles, conI TALİTE

vm the instin These are situated q! Lables the maximum seating arcom- ers and buskets, Retus removal wil modation of 176 students is obtained be by metal bins with Ilds to be plae- where l is presumed a night porter

all exits except the mam entranc Tio» tutal number of students in the ad for collection in the outer yard, will be um duty. completed college, 19 envisaged at present, is 204 students If all the First Floor-A Library and Recrea-

Quarters for servants are also pro atudents use the dining hall for any tion Room 320′′ x 300" is situated on vided on the north side of the sile. particular meal during a day, it is the first floor. It has an open terrace Griffin Unit-The detalls for th doubtful If they would all be present on the north side. Lavatory accom- Griffin Hall are as shown on the In the dining hall at the same time medation may be required to serve plans but they have not en før ben Pruvision is made for 176 at one time this fluor and the use from the

for

and this appears to be ample for any Dining Hall during social occasions, worked but to any extuot meal, the serving of which is spread If Marden Ball is to be occupied by Time

Completing -Provides over, say, two hours It is possible both sexes for & temporary period, there is no foresten delay, it will that unly 150 would be in the dining two sets of lavatory accommodation be possible to call for tenders for hall at one time and in this event It will be required on this. Door None the first part of the scheme by D- would be possible to rearrange the has been shown on the plan but It cember 1953, and the building work wating and give, say, 2'0′ spacing could be provided in the area resory- should take about 10 months to com- and more liberal gangway Space ed as Cleaners' Store and under the pilete. making the date for completion which is shown at present at 26". stairs leading to the upper floor. of the first part, September 1954

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.