112
maximum of 780 bathers at any one time. Total water capacity of the pools is just over one million gal- lons and this is purified every hours.
5
There is ample space for sun-bath- ing and Palm trees provide shade around the pools. The champion- ship and children's pools are divided by a natural terraced rock mound.
The championship pool, measur- ing 50
metres long and 20 metres wide with water depth varying from 4 to 12 feet allows staging of swim- ming events under international rules. Black-glazed tiles to mark the lanes for the guidance of swimmers can be seen clearly at the bottom of the pool. Nine starting platforms are mounted at both ends of the pool.
Non-slip one-metre and three metre diving boards are provided in a separate area so that diving can be carried on without interfering with general bathing or events in the other pools.
The children's pool with a depth of four and a half feet at the deep and two feet at the shallow end is equipped with a water wheel and
not
chute. The paddling pool water is re-circulated through the filter plant but is run to the reception tank for horticultural purposes.
The cafeteria accommodating over 300 persons is sited on the terrace immediately behind the tiered view- ing area which overlooks the pools, the whole park and down and over the Kai Tak airport runway to Lyemun Pass beyond.
Considerable difficulty has been experienced with the flood lighting of the pools as the light poles were restricted in height by the Kai Tak airport approach Regulations.
The second stage of the develop- ment of the Kowloon Tsai Park in- volves the contruction of a full-size football field with a running track and other facilities for athletic meet- ings, tennis courts, basketball courts. volleyball courts, soccer pitches, a children's playground and a library.
Actual time for completion of the work was 3 years.
The main contractor was Hung Yue & Co.
Other contractors and suppliers included.--
ELECTRICAL INSTALLATION:
Engineering Service. FILTRATION PLANT:
The Jardine Engineering Corp., Ltd. (Paterson)
DIVING BOARDS:
Aluminium Spring Board. (Wyndsor).
Government Stores (Crown In- dent).
TURNSTILES:
Dodwell & Co., Ltd. (Bailey).
ROOFING:
Plastic roofing Shewan, Tomes (Equipment) Ltd. (Polaplex). FLOOR AND WALL TILING:
Lee Yu Kee. Ltd.
ASPHALT TILING:
Annual Government Contract Goodman Trading Co. HARDWARE, SANITARY ELECTRICAL FITTINGS:
AND
Standard Government fittings Government Stores
TURFING AND TREE PLANTING:
Gardens
Council,
Department,
SPECIAL SWIMMING POOL EQUIPMENT:
Urban Council.
Urban
IT'S CHEAPER
AND BETTER
WITH BROOMWADE
BUILDING CONTRACTORS
PLUMBERS AND COUNCILS.
will be astonished at how quickly the surprisingly small outlay for this " BROOMWADE" Compressor outfit will be repaid by slashing the present costs of "Pick and Ebovel
methods
WR120
"BROOM WADE" Rotary Air Compressor. Petrol or Diesel driven. Delivery 120 cƒ m. of free air at 100 p.s.i.
J
RB440
BROOMWADE"
Pneumatic Breaker. Deliv ers 1200 blows per minute. Low air consumption. Steel shank 6′′ 1′′ Her. Incor- porating Swing Stirrup.
Sole Agents:
"BROOMWADI”
Air Compressors & Pneumatic Tools Your Best Investment
INNISS & RIDDLE (CHINA) LTD.
512-520, Gloucester Building, Hong Kong.
Telephone: 28091
THE HONG KONG & FAR EAST BUILDER-VOLUME 19, NUMBER 2