AMAHS
KIT.
TIT
LAV LAV
COOLES
BOYS' LAV.
GIRLS' LAV
COVERED 'PORCH
COVERED CARETAKERS CARETAKERS
YARD
CHANGING SHOWERS SHOWERS CHANGING
FLOWER BED
[ST]
C 0
R AL D с R
00
SWITCH
OPEN
FLOWER
TEO
PORCH
LIBRARY
PLAYGROUND
с
R
FLOWER BEO
ST.
STORE
STORE
PUMP
GENERAL OFFICE
CLASS RM
CLASS RM
CLASS RM
CLASS AM
CLASS RM
STORE
-DN
ACCESS
BALCONY
MEDICAL INSPECTION
4TH FLOOR PLAN
LAV
Aalon
The stage has been equipped with lighting in- stallations ade- quate for moder- ately sized pro- ductions. The general lighting in the hall is multi-
similarly
purpose.
STORE
-DN
ACCESS
BALCONY
BIOLOGY LABORATORY
BIOLOGY & CHEMISTRY
The hall has been planned to pro- vide the maximum amount of cross ventilation. Artificial ventilation -- necessary during film shows and when natural ventilation is not adequate has also been provided in the form of 30 inch exhaust fans under the balcony and in the false ceiling.
Looking across to the Assembly Hall.
ENTRANCE HALL
GROUND FLOOR PLAN
SCALE
FT
PLAYGROUND
GAS STORE
CLASS RM.
LAV
CORRIDOR
-DN
-UP
HUP
The general contractor for the project was Yick Lee and Co. Ltd. Quantity surveyors were C. John Mann & Son and Yeoman and Ed- wards. Suppliers and sub-contractors included.-
PILING: Gammon (Hong Kong)
Ltd.
ELECTRICAL: Empire Engineer-
ing Co. Ltd.
METAL WINDOWS: China Steel
Works Ltd.
LOUVRE WINDOWS: Davie
Boag & Co. Ltd.
FLOOR, WALL TILES: Sino-
Britsh (Hong Kong) Ltd. ASPHALT ROOFING:
Bradley & Co. Ltd.
Reiss
GAS APPLIANCES: The Hong
Kong and China Gas Co., Ltd. PAINTS: Butterfield & Swire
Durocrete, Duro).
CUPBOARD FANS: The British
General
Electric Co. Ltd.
Woods).
No comments yet.
Private notes are available after approval.