those at Wo Lok, but linked, at right angles, in pairs. On this project the concrete is being poured between steel formwork, in panels of 4'-0" x 2'-0", each panel framed and stiffen- ed with mild steel angles. Adjustable steel props and telescopic supports are being used to carry floor slabs during construction and very good surface finishes are being achieved. Approximately 22 miles of piling has been used. in reclaimed land.

On both estates a dual plumbing system has been installed, using plastic piping for the salt water Hushing service. This, at Fuk Loi. has necessitated the Authority putting in its own 8" high pressure supply main pumped almost one quarter of a mile from the sea.

Pursuant to the Authority's policy, all rents are based on the gross area

of each flat. and are fixed at an economic level in order that the income will cover all management expenses and other outgoings, in- cluding the amortisation of the total capital expenditure land, buildings, fees and administration) on particular scheme.

any

Both schemes have been designed in the Housing Authority's Architec- tural Section, Cheung Sing-hoi being the Architect-in-Charge for Wo Lok and Donald Liao for Fuk Loi. Mr. W. Szeto was the Enginer for both Estates. and Messrs. Langdon & East). the Quantity Every (Far Surveyors.

contractor

Main

for Wo Lok (Phase I) was the Cheong Lee Con- struction Co. Ltd. Suppliers and sub-contractors included:

ELECTRICAL:

gineers Ltd.

The China En-

METAL WINDOWS: Canton Metal Window Mfg. Co. Ltd. LOUVRES: William Jacks & Co.

Ltd.

PRESSED STEEL DOORS: Dod-

well & Co. Ltd. (Crittall).

ROOFING: ASPHALT

British (H.K.) Ltd.

Sino-

PLUMBING: Tung On Plumbing

Co. Ltd.

PAINTS: Duro Paint Mfg. Co. Ltd. Durocrete Waterproof Cement Paint),

Main contractor

for Fuk Loi. Phase I & II is the Goodman Co, Suppliers and sub contractors in- clude:

70

Up

DN

TYPICAL FLOOR PLAN, LOW BLOCK

BAL BAL.

¡BAL. BAL.

KIT.

KIT.

| KIT

BAL. BAL.

BAL. BAL.

KIT

KIT

KIT,

KIT

LINK

7

PE SO

BAL

C

о

R R

D

R

P E

KIT

KIT

BAL.

BAL. BAL.

BAL.

U

KIT. KIT.

BAL.

BAL.

7

Txit.

KIT. KIT.

N 5

KIE

KIT

KIT

BAL BAL.

BAL.

BAL

BAL.

BAL.

BAL

BAL.

BAL.

T

KIT. KIT.

KIT. KIT.

LIFTS

PERSO

$

COR

R

PER S ONS

KIT. KIT

KIT. KIT.

KIT. KIT.

BAL.

BAL.

BAL.

0

BAL.

BAL.

D

R

KIT. KIT.

PLAYING

BAL.

BAL

BAL.

100,

S

C A L E

16

24

32

40 48 FT.

THE HONG KONG & FAR EAST BUILDER

- VOLUME 18, NUMBER 1

.CE

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.