No_1_1960 — Page 27

Far East Builder 遠東建築雜誌 All

Inside the individual offices and executives' suites are large plate glass windows from floor to ceiling. They afford a maximum clear view area. yet. at the same time. atmosphere of quietness and repose is retained in these fully-carpeted and curtained rooms.

an

A vertical black recess splitting the middle of the white columns creates an impression of slenderness in what would otherwise be heavy- looking supports.

The sharp contrast between the white Formica columns and the dark Bombay rosewood panel parti

tions gives the bank a fresh and neat appearance. The panelling is relieved by inset strips of aluminium.

Total cost of the bank, including two lifts. was $417.500.

General Contractor: Peck &

Wilson. Ltd.

Aluminium Work:

Aluminium Ltd.

Hong Kong

Lifts: Two Sabiem passenger lifts. each of 900 ibs. capacity. supplied by Gilman & Co. Ltd. Electrical wiring installation, fittings.

lumenated ceiling: G.E.C. Ltd.

The British

one

Supply and installation of

Chubb's anti-blowpipe, banker's quality vault door and emergency door: The Jardine Engineering Corp. Ltd.

Terrazzo paving on first

floor,

marble to the ground floor en- trance; Travertino Romano walls with Belgian black trimmings; Siliac amber floor and Belgian blue architrave to main entrance: Raoul Bigazzi.

[ELEVATOR ELEVATOR

FLOWEP

XOT"

MANAGER

LOBBY

REGIONAL MANADER

MACHINE ROOM

ELEVATOR

ON-

STRONG ROOM

SAFE

THE HONG KONG & FAR EAST BUILDER ·

OFFICE NO

ELEVATOR

ENTRANCE

STAR CAKE

OFFICE HOJ

OFFICE HO Ú

OPERATOR

ELEVATORS

LOBST

Left, ground floor plan. Above, second floor plan (interior design). view showing entrances to offices of sub-manager, secretary, and others.

Below,

VOLUME 15, NUMBER 1

25

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.