building is serviced by six lifts which, together with the five lifts in the earlier portion, makes a total of eleven lifts for the building, all supplied by the British General Electric Co., Ltd.

The building is constructed on a struc- tural steel frame skeleton, and it is worthy of note that in spite of its 14 storeys of height, the dimensions of the lowest and heaviest columns are only 18" x 18", in- cluding the necessary fire protection casing of concrete.

The external wall facings are of pre-cast terrazzo slabs 2" thick, bonded and tied to brickwork backing.

THE STEEL FRAMING

The complete building which was erect ed in two phases contains 2,700 tons of steelwork.

The

steelwork

was designed

in the

3 C A

C

H

A

D &

O E U

HOUSE

*

orthodox manner for a building of this type, beam to stanchion connections being

ordinary top and bottom cleats except (Above) Ground floor plan. where loads and web capacities of beams

demanded that the lower bracket be in- (Below) Typical floor plan. creased in depth and/or thickness, and where beam eccentricities demanded that the modulus of the rivet group in the lower bracket be increased.

In all, the building contained 207 stan. chions which were delivered in 1,163 separate lengths. Phase I having 96 stan chions delivered in 636 lengths and phase I having stanchions delivered in 527 lengths, the longest stanchion being ap- proximately 180 feet long, delivered in 9 pieces.

All stanchions sit оп steel slab bases. the maximum stanchion load being 604 tons and the thickest slab base being 4' thick. The pitch of rivetting on all com- pound stanchions is closed at the base and splices and at all points of concentrated load such as occurs at floor levels from incoming floor beams.

VENT & PIPE DUCTS

A É

III.

internal floor beams which require a tailing well cause further damage to the control All site connections were by means of down force at their inner ends which im gear. The arcade lights incorporate the black bolts except for stanchions splices

part only vertical load to the perimeter now well-known "Atias" Louverene Pris beams. and canopy cantilever beams in which site

matic Transparent Plastic Panels. connections were by means of Turned THE ELECTRICAL INSTALLATION OF Barrel Bolts. In all approximately 90,000 PHASE II

site bolts were inserted of which 47,000 The electrical installation was an ordin- were used during the construction of Phase ary surface T.R.S. wiring job, all cables I. and the balance of 43.000 during the being of W.T. Henley's Telegraph Works

erection of Phase II.

were

Co., Ltd.'s make and bakelite accessories All the above quantities whilst reason. by Messrs. J.A. Crabtree & Co., Ltd. ably accurate are, of course, only close

However, it is worthy to note that there approximations.

two "firsts" incorporated in the Due to the shape of the site, the lengths various installations of this building. (i) of many beams had to be calculated and the "Lincoln” multi-gang flush switch was in certain areas of the building these cal- used for the first time in Hong Kong and culations were further involved on account (ii) the "Lumenated Ceiling" a new light of the Ice House Street, Chater Road ing concept, was also used for the first corner being a fraction of a degree less time in Hong Kong and possibly the Fat than a right angle which caused the stan chion grid lines to form quadrilaterals.

The canopy steelwork also needed spe

East, in three places in this building, Jar dine's showroom, the Airways booking showroom. office and the National Cash Register Co

The Lightning Conductor System, as in the first section, utlizes the steel frame of the building as the conducting medium between the air finials and the earth elec trodes.

The third, fourth and fifth floors of this building are provided with Troughton & Young's tungsten fittings, the tenants con- cerned

"'warmer' preferring the

light given by tungsten against that of fluore scent fittings.

The cost of tungsten fittings is consider- ably less than that of good quality fluore- scent fittings, and after consultation with the China Engineers, Ltd., a standard fit- ting was used throughout the offices to give approximately 10 lumens per sq. ft. over the entire office space. The fittings cial consideration in order that it should

chosen were from the Ultralux range and not impose torque or moment on the main The Public Lighting System comprises are the type with an open bottom, there- stanchions or torque on the main peri- almost exclusively of "Atlas" High Power by allowing lamps to be changed with- meter beams. This condition was achieved Fluorescent Lighting. All passage and ar- out removing the glassware. Also these by arranging the steelwork in such a man- cade lights are "Quickstart" operated, fittings do not collect dirt and insects, an ner that cover straps using Turned Barrel which means that when a tube fails it important consideration where offices are Bolts would transmit the cantilever me just goes out, instead of flickering on and not air-conditioned.

For decorative pur- ments over the perimeter beams to the off for long periods, during which it may poses, fittings from the "Versalite" range