No_12_December_1969 — Page 51

Far East Builder 遠東建築雜誌 All

Jockey Club Road, Shek Wu Hui Ian J. Campbell

W. Szeto D.C. Shum

NEW TERRITORIES

T/C Bldg.

J/O Sha Tsui Road &

S.L. Ho

Tso Kung Street, Tsuen Wan

A/C Bldg.

Residence

Telephone Exchange

622

Hoi Pa Street, Tsuen Wan

S.L. Ho

Au Tsai Pui, Sai Kung

Liu Hok Yan

School

4

Texaco Road, Tsuen Wan

P.C. Chau

School

5

Tsuen Wan

School

6

Lam Tai, Castle Peak

T/C Bldg.

Tai Wai Village, Shatin

T/C Bldg.

6

Tai Po

T/C Bldg.

4

Sha Tau Kok

T/C Bldg.

7

Sha Tsui Road, Tsuen Wan

T/C Bldg.

6

T/C Bldg..

6

Factory

Factory

Factory

8

Factory

9

Garage

2

Memorial hall

2

Shek Ku Lung, Tai Po

Castle Peak Road, Yuen Long Chuen Lung Street, Tsuen Wan

Kwai Chung Road, Kwai Chung Kiu Tau Wai, Ping Shan

Kwai Chung 2nd Stage

Ta Chuen Ping St. Kwai Chung

Chai Wan Kok Street,

Tsuen Wan

contracts awarded

HONG KONG

Electrical installation for Govern- ment Low Cost Housing blocks 4, 5, 6, 7 and 8 and Estate School 4 at Kwai Fong Estate, Kwan Chung, New Territories. $618,250.

Castle Peak New Town Stage IA roads and drainage works for parts of areas 9 and 10. $1,899,906.

Kai Tak Airport Runway Extension

-

site investigation for borrow areas. $293,080.

Piling to foundations for Blocks Nos. 14 and 15 at Pak Tin Resettle- ment Estate, Kowloon. $562,160.

Construction of Lantau

Tung

Chung River Training Scheme Stage 1. $356,150.

-

Improvements to bends along Clear- water Bay Road (Anderson Road to Hang Hau). $389,927.

Supply and laying of main drainage system and external water supply for improvement to Sek Kong South Camp. New Territories. $245,704. Supply of metal windows for estate school No. 7 attached to Domestic Resettlement Housing (Block 15) at Ham Tin (Area "B"), Kowloon. $21,396.

Floodlighting installation for games pitches in Public Parks. (2nd Group). $82,500.

Supply and installation of an air- conditioning system for Causeway Bay Post Office, Clarke Mansion, Kingston Street. $26,750.

Reiss, Bradley & Co., Ltd.

Lingking Brothers & Co. Ltd.

Malayan Drillers (H.K.) Ltd.

Vibro (Hong Kong) Ltd.

Cheong Hing Construction Co.

Yeu Shing Construction Co.

Fook Lee Construction Co., Ltd.

China Steel Works Ltd.

The China Engineers, Ltd.

The Empire Engineering Co. Ltd.

Lo Wan Kwoot Guy W.K. Chan H.Y. Chan Lo Wan Kwoot Guy W.K. Chan S.L. Ho

Peter P. Sze

Chau Ho Ming

Rudy T. Lau

Bernard Leung David Lee Tai Wai

Don S.D. Pan

Ho Mei Chun

Chan Ping Sun

Chung Pok Sang

The Hong Kong Telephone Co. Ltd. The Hong Kong Buddhist Association Lutheran Church Missouri Synod

Sik Sai Chun

Yam Kai Wah & Yam Tze Ming

Lam Choi Wan

Teng Yu Wing

Chan Po Fong & Ho Mei Chun

Lam Kan

Wong Chung Ming

Sung Keen Hong Ltd.

Wong Shui Ying

Paulum Spinning & Weaving Mills Ltd. Tong Iu

Metro Cars (H.K.) Ltd.

The Tata Buddhist Association

Supply and installation of metal roller shutters and roller grilles for a multi-storey car park at Central Re- clamation (near Rumsey Street), Hong Kong. $10,834.

Construction of spectator stand for Maple Street Playground, Kowloon. $188,258.

Construction of 4 No. standard 2- storey restaurants in Ngau Tau Kok Resettlement Estate. Kowloon. $212,016.

Supply of flush doors for Domestic Resettlement Housing (Block 15) at Ham Tin (Area "B"), Kowloon. $39,932.

Piling to foundations for kinder- gartens at Blocks Nos. 10 and 12, Ngau Tau Kok Resettlement Estate, Kowloon. $37,540.

Supply of metal windows and doors for the Lady Trench Day Nursery and Training Centre at Morrison Hill Road, Hong Kong. $56,177.

Electrical installation for Tsz Wan Shan Resettlement Estate Recreation Ground, Kowloon. $67,400.

Supply and installation of aircon- ditioning system at Ammunition Depot Magazine, 59, Stonecutters Island. $17,414.

Electrical installation for Domestic Resettlement Housing (Block 53) at Tsz Wan Shan (Area “A”), Kowloon. $176,000.

Improvement to the airconditioning system at City Hall Restaurant, Hong Kong. $52,240.

Supply and laying of vinyl asbestos floor tiling for Yau Ma Tei Govern- ment Slipway Reprovisioning Stage II (Buildings). $123,429.

Supply of asbestos cement goods for New Mark VI Domestic Resettlement Housing (Blocks 16 and 17 and estate schools 3, 4 and 5) at Pak Tin (Area "A"), Kowloon. $294,437. Supply, installation and contract maintenance of 3 passenger lifts for Domestic Resettlement Housing block 53 at Tsz Wan Shan, area A, Kowloon. $254,280.

Suzuki Shutter Co. (Hong Kong) Ltd.

Shing Hing Construction Co.

Kwan Lee Construction Co.

Hip Hing Timber Co.

Paul Lee Engineering Co., Ltd.

China Steel Works Ltd.

GEC-AEI Hong Kong Ltd.

International Engineering Ltd.

Gilman & Co., Ltd.

American Engineering Corpn. Fed. Inc. U.S.A.

Times & Company

Tsing Yi Island Industries Ltd.

Hitachi Elevator Engineering Co. (H.K.) Ltd.

Far East BUILDER, December 1969

49

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.