No_12_December_1969 — Page 38

Far East Builder 遠東建築雜誌 All

Right side bank. H.W.L 2.550

Tama River

Kawasaki City

Designed river bød 3.750

Caisson

Caisson

Submerged tube

Fig. 1

Present river bed T.P. — 400 -3.750

Earth filling (B)

Fig. 3

FINI Fig. 4

36

Fig. 2

BE8

Shaft

Submerged

tube

tube

Submerged Submerged Submerged || Submerged

tube

tube

tube

Shield

„Gasket gum packing

H.W.L T.P. + 2.550

*T.P 0.000

Alluvium

river bed T.P.- 3,670 ~ 3.750

Diluvium

13.000

ARMIGIANTESSE

B

Earth Filling (B) „Protective crushed stone

Ferroconcrete

shall

Filling (A)

# T.P. — 14,682 ~~17,185

.700

2.700

12.700

9,600

crushed stone

~Automatic coupler

прип

Water pressure.

Placing barge

Haneda Airport

Bulkhead

Gasket gum packing

Draught

Fig. 5

Weld

Fig. 6

Discharge water

Concrete placing

Far East BUILDER, December 1969