No_12_December_1969 — Page 18

Far East Builder 遠東建築雜誌 All

FIRST FLOOR PLAN

SCALE

10 20 30 40 FEIT

20

21

22

16

18

13

32

29

44

40

23

47

13

ENTRY

43

33

10

#

13

19

17

First floor tegend

1

3

ELEVATORS

4

6

7

8

MAIN LOBBY FLAGPOLE

9 STORAGE SPACE

10 SUPERINTENDENT

11 STORAGE

12 CUSTOMER'S

RELATION

13 ELEVATOR LOBBY

14 JANITOR'S ROOM

15 PANEL BOARD RM.

(ELEC.)

16 STAIRS

17 CASH VAULT

18 A C ROOM

19 CASH DEPT.

20 CONFERENCE

ROOM

21 COUNTER

22 PERSONNEL DEPT

23 LADIES TOILET 24 GENTS TOILET 25 UTILITY ROOM

26 POOL

27 PART OF ORCHESTRA

28 ORCHESTRA LIFT

29 STAGE

30 VESTIBULE

31 DRESSING ROOM

32 REVOLVING

PLATFORM

33 SCULPTURED

PYLON LIGHTS 34 SIDE WALK ELEVATOR

35 FIRE ALARM

SYSTEM

36 TELEPHONE BOOTHS 37 GOODS & LETTER

LIFTS

38 RAMP TO BASEMENT 39 FIRE ESCAPE RAMP

40 INTERMISSION LOUNGE

41 BAR

42 KITCHEN

43 STORAGE

44 AC ROOM FOR

THEATRE & LOUNGE

45 THEATRE RAMP 46 ESCALATORS 47 HALL

Basement legend

2

3 ELEVATORS

4

5

6

49

47

7

8

9

50

43

31

ELEVATOR LOBBY

A.C. ROOM

BLOWER ROOM

10 MAIL ROOM

11 ELECTRICAL ROOM

12 LADIES TOILET

13 GENT'S TOILET

14 ELECTRICAL PANEL BD. ROOM

15 CENTRAL SUPERVISORY

AND CONTROL CENTER

16 SECURITY OFFICE

17 PANTRY

18 STAGE

19 SEMINAR HALL

28

20 DIMMER'S ROOM

21 RAMP

22 DRIVEWAY

23 PROMPTER'S BOX

24 INSPECTION

25 REPRODUCTION CENTER

26 STORAGE VAULT

27 OFFICE

28 PROJECTION ROOM

29 WASTE & GARBAGE CAN

AREA

30 AHU ROOM

31 DINING AREA

32 DISH & GLASS WASHING

33 DRY GOODS STORAGE

34 LINEN & SPECIAL WARES

STORAGE

35 EMPTY BOXES & STORAGE

ROOM

36 MEAT & POULTRY FREEZER 37 MEAT & FISH PREPARATION 38 FISH FREEZER

39 DAIRY & DELICIOUS

COOKER

40 ICE CREAM & MISCEL-

LANEOUS FOOD

41 VEGETABLE PREPARATION 42 FRUIT & VEGETABLE

COOKER

43 ORCHESTRA PIT

44 KITCHEN

45 ELEVATOR MACHINE

ROOM

46 JANITOR

47 STORAGE

48 SIDEWALK ELEVATOR

49 STORAGE

50 REHEARSAL ROOM

소소

22

201

24

BASEMENT FLOOR PLAN

SCALE

0 10 20 30 40 FEET

26

25

27

29

20

1234u

ELEVATORS

5

6

7 GENT'S TOILET

Ty

8 UTILITY ROOM

9

LADIE'S TOILET

10 EXECUTIVE'S TO

11 JANITOR'S ROOM 12 ELEVATOR LOBB

Far East BUILDER, December 1969

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.