350 ft. long. This building is also con- nected to the training school by covered ways at ground and first floor.
Living accommodation for the staff of the three departments is provided in three three-storey blocks sited fur- ther up the hillside.
All the buildings are simple column and beam structures in reinforced con- crete with concrete spandrels below the windows and brick infill panels. The windows are set between vertical concrete sunbreakers.
External finishes are cement rend- ering and Japanese mosaic tiles on the spandrels. The structural frames are painted grey, the vertical fins and brick panels white, and the metal windows
black. The same treatment is applied to every building so that the whole com- plex is in a uniform design.
The total cost of the project was approximately HK$6.5 million. Site formation work commenced in late December, 1965 and the project was completed in March 1968. The overall construction time was two years and three months.
Contractors
On Lee and Co. was the main con-
tractor:
asphalt
Sub-contractors included: Precast Products Ltd. roofing.
Engineering Service, PWD - electri-
Largest of the three fair-faced concrete drill towers 91ft. high
-
cal services and lighting installations. Canton Metal Windows Co. Ltd. metal windows.
-
La Salle Co. – aluminium doors. Shewan Tomes (Equipment) Ltd. Brookes sliding and folding metal doors. William Jacks & Co. (HK) Ltd. louvres.
On Lee and Co. - tiling.
-
Three-storey staff living accommodation
Far East BUILDER, November 1968.