Columns and beams in position awaiting road slab
Above right: positioned
Prestressed beam being
Work
ing Co., Ltd. was accepted. was commenced on April 6, 1965, and the scheduled contract period was 15 months.
As interference to traffic had to be kept to the minimum, it was agreed by the Traffic Police that single lane traffic be permitted in Princess Mar- garet Road and for north-bound vehicles in Waterloo Road but that two lanes were required for south- bound vehicles in Waterloo Road. This meant that most of the road
construction at ground level had to be completed before construction work on the flyover could be com- menced.
Road works on the Waterloo Road section could not be started in earnest until a 48 in, water main, 12 in. water main and Telephone Co. multiple-ducts were completed, SO initially work was concentrated on the southern and central sections of the scheme.
A Critical Path Analysis was pre-
60
INAL DELAY
A
ACAS
PARIYARSAER BEEN
น
D. PUM
SECTION 1-!
L
MO
CEMENT PRÁVO
A& CANTILEVER DEAN
E
Aubben, scJA, VO PAR
SECTION 2-
Z -
AAPAD 3044
PIEK
+
-+-
2. } @-
Ʌ
}
1
4
S C A L E
2
6
8 FT
SE LEA¢A Row)
2.0*
+
AC ADID BUS
ARAM
Kakšen DEJA NG NO
EXPANSION JON?
-T
Laser kom )
SECTION 3-3
لم
DETAIL FOR CANTILEVER BEAM ON PIER
Far East Architect & Builder May, 1966