56
terminal towers for the Aberdeen Harbour crossing of the overhead transmission line system by which the power generated at Ap Lei Chau will be transmitted to the centres of load on the north side of Hong Kong Island.
The overall co-ordination for both the site formation contract and the power station buildings contract has been undertaken by the Technical
Planning and Development Depart- ment of the Hongkong Electric Co.. Ltd.
Site Formation Contract
Main Contractor & Co. Ltd. Sub-contractors
the wharf wall Ltd.
J
―
George Wimpey
Construction of
-
Yau Wing Co..
Preliminary access roads. etc.
Federal Dredging and Reclamation (H.K.) Ltd.
Fixing reinforcement for chimney base
Chimney Construction
Left: By using a method of climbing formwork concrete placing was an almost continuous opera- tion. By February 1967 a height of 90 ft. had been reached
Below: Shell of chimney finished in April 1967
Far East Architect & Builder June, 1967