Interior view of lecture theatre No. 1 from demonstration bench
Top right: Theatre interior seen from top aisle
Contractors
The main contract was let to Ori- ental Structural Co. in March 1965 and the building was opened by the Prime Minister of Singapore, Mr. Lee Kuan Yew in July 1966.
The cost of the building contract M$666,634.19, excluding air-
was
conditioning.
Sub-contractors included:
Air-Conditioning Jardine Waugh
(M) Ltd.
Electrical
Ltd.
Plumbing
Ltd.
Malayan Engineers
Watts and Baker
Aluminium Roofing
Co., Ltd.
Diethelm
Vinyl tiles Dunlop (M) Ltd.
J
Piling Gammon (M) Ltd.
Covered way linking lecture theatres 4, 3, 2 and 1
40
View from science tower showing lec-
ture theatres Nos. 3, 2 and 1
Far East Architect & Builder July, 1967