TIPICAL CE
SECTION...A-A.. QZ DAM.
My rock or to
Holes for contact grouting-
Parapet wal!
Art
Move wall
Slope 1 m 1
figulated
reinforced concrete
Nominal
Rocktill
Headworks will be located at Pelubang near Lengkuas, and Jeniang. The headworks at Pelubang will control the supply to the Northern Canal (max. discharge 2,730 cusecs. 23 miles long) and to the Central Canal (max. discharge 1,830 cusecs. 24 miles long). The headworks at Jeniang will control the supply to the Southern Canal (max. discharge 900 cusecs, 13 miles long).
.062
אס.
*OS?
DEL
-Cut - off
india hotes for curtain grouting
Hand placed rock layer
Construction of the canals will give rise to a variety of structures, including head regulators at the bar- lages, regulator gates at the heads of the distributary canals, bridges, in- verted siphons, a short tunnel, and drop structures to regulate the water levels in the southern main canal.
The ratio of benefits to total pro- ject cost is the very favourable one of about 3.8:1, without taking into
ting
Feet 10
$
Scole
0
account increased production of bran, or the valuable timber which will be available when the reservoir areas of about 30 square miles are cleared.
The economics of generating hydro- electric power utilising the discharge for irrigation at Pedu dam are also being investigated by Sir William Halcrow & Partners in association with Preece, Cardew & Rider, Lon- don, for Central Electricity Board.
SUNGE: PEDU
.OSE
.0%
370
DUC
120
180
PLAN
730
240'
OF DAM
Scale
Ralqining wall
Drainage systém
Spillwe
channel.
མ་
180
370*
320
20:
Page 40Page 41