TIPICAL CE

SECTION...A-A.. QZ DAM.

My rock or to

Holes for contact grouting-

Parapet wal!

Art

Move wall

Slope 1 m 1

figulated

reinforced concrete

Nominal

Rocktill

Headworks will be located at Pelubang near Lengkuas, and Jeniang. The headworks at Pelubang will control the supply to the Northern Canal (max. discharge 2,730 cusecs. 23 miles long) and to the Central Canal (max. discharge 1,830 cusecs. 24 miles long). The headworks at Jeniang will control the supply to the Southern Canal (max. discharge 900 cusecs, 13 miles long).

.062

אס.

*OS?

DEL

-Cut - off

india hotes for curtain grouting

Hand placed rock layer

Construction of the canals will give rise to a variety of structures, including head regulators at the bar- lages, regulator gates at the heads of the distributary canals, bridges, in- verted siphons, a short tunnel, and drop structures to regulate the water levels in the southern main canal.

The ratio of benefits to total pro- ject cost is the very favourable one of about 3.8:1, without taking into

ting

Feet 10

$

Scole

0

account increased production of bran, or the valuable timber which will be available when the reservoir areas of about 30 square miles are cleared.

The economics of generating hydro- electric power utilising the discharge for irrigation at Pedu dam are also being investigated by Sir William Halcrow & Partners in association with Preece, Cardew & Rider, Lon- don, for Central Electricity Board.

SUNGE: PEDU

.OSE

.0%

370

DUC

120

180

PLAN

730

240'

OF DAM

Scale

Ralqining wall

Drainage systém

Spillwe

channel.

མ་

180

370*

320

20: