trance, is directly reached from the main service core. Also located on the same floor are the social hall and canteen which open to a deck roof to take care of overflow.
A well-equipped audio-visual room for recordings and a library are also on the second floor, easily accessible to department heads and managers.
The Commissioner's offices are on the seventh and eighth floors, Each executive office is individually arrang- ed with its own waiting area.
Contractors
The general contractors were William Golangco & Co.. Manila.
Specialist contractors included:
Electrical
PACES
Plumbing J. Hernandez Co.
——
Air-Conditioning
Elevators
Aircon, Inc.
Otis Elevator Co.
Steel doors and windows Sanson
Steel Windows
Aluminum louvres Works, Inc.
Aluminum doors
Inc.
Permaline.
Interior of lobby display looking north, showing the folded plate roof. The three double doors at left constitute the main entrance into the building.
At right is a portion of the inner court and beyond it is the bridge. At the far end of the lobby display are two double doors that lead to the tellers' cages in the Treasury Department.
Dreptarti Engineers
P.W. DILLOWAY LTD
SOUTHALL MIDDLESEX ENGLAND
new
TRACKS
ROLLERS
SPROCKETS
IDLERS
44
for CATERPILLAR
ALLIS CHALMERS
•
INTERNATIONAL
CASE
FOWLER
•
J.DEERE FIAT
Far East Architect & Builder February, 1966
No comments yet.
Private notes are available after approval.