THI
East block of the police quarters seen through low-cost housing in Shatin Pass Road
to the east of the site. This has a fully equipped dental surgery, medical officer's room and nurses' station, as well as an injection room and dis-
pensary.
The space between two of the buildings and the perimeter wall is turfed and divided up into small areas with screen walls and planting, while the remaining space consists of access roads and car parking.
The main contractor was Sang Hop Construction Co. Other contrac- tors included:
Lifts
Electrical
G.E.C.
G.E.C.
Piling Kee Yip Co.
-
Site formation Ching Hing Co.
TT
LIVING RM.
VER.
LIVING RM.
手
KIT.
KIT.
LAD
RAV.
VER.
44
TYPICAL FLOOR PLAN
S
4
CALE
8
12
16 FT.
Far East Architect & Builder December, 1967
Page 20Page 21
No comments yet.
Private notes are available after approval.